flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tips for designing with fire rated glass - AIA/CES course

Tips for designing with fire rated glass - AIA/CES course

This BD+C University class is worth 1.0 AIA LU/HSW.


By BD+C Staff | April 30, 2013
For a recent renovation of a stairwell and exit corridors at Ridgewood High Scho
For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified

SAFTI FIRST and Kate Steel of Steel Consulting Services team to offer tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. In this class, they demonstrate how to: 

  • Distinguish between fire protective and fire resistive glass and glazing systems
  • Interpret IBC code and fire test requirements
  • Recognize fire rating listing limitations
  • Determine the best product value for your budget

 

TAKE THIS FREE AIA/CES COURSE AT BD+C UNIVERSITY

 

"Designing with Fire Rated Glass" is also available as live webinar or broadcasted at your location, delivered by Kate Steel. For over 15 years, Kate has been actively participating in code development committees responsible for promulgating fire and safety glazing provisions in the IBC. She has successfully trained architects, specifiers and code enforcers on the correct and code approved use of fire rated glazing and framing products. To schedule a hosted webinar or a live presentation, please contact dianas@safti.com.

Related Stories

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Earthquake engineering keeps airport grounded

Istanbul, Turkey's new 2.15 million-sf Sabiha Gökçen International Airport opened on October 31, 2009, becoming the world's largest seismically isolated building. Arup's global airport planning and engineering team, in collaboration with architects Dogan Tekeli Sami Sisa Mimarlik Ofisi and contractor LIMAK-GMR JV, working within an 18-month timeline, designed and built the facility wi...

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021