flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 35 Airport Terminal Architecture and A/E Firms

Top 35 Airport Terminal Architecture and A/E Firms

Corgan, HOK, and Gensler top Building Design+Construction’s annual ranking of the nation’s largest airport terminal architecture and A/E firms, as reported in the 2016 Giants 300 Report.

 


By BD+C Editors | July 29, 2016
Top 35 Airport Terminal Architecture and A/E Firms

Concourse J at Miami International Airport. Photo: Martin St-Amant/Wikimedia Commons.

TOP AIRPORT TERMINAL ARCHITECTURE
AND A/E FIRMS
Rank Firm 2015 Revenue
1 Corgan $65,839,265
2 HOK $60,840,000
3 Gensler $44,390,000
4 Gresham, Smith and Partners $25,600,000
5 RS&H $24,300,000
6 Stantec $19,226,351
7 HNTB Corporation $15,998,381
8 HKS $15,309,071
9 Leo A Daly $13,529,252
10 Alliiance $11,260,000
11 Heery International $9,935,444
12 Schenkel & Shultz $8,367,781
13 Skidmore, Owings & Merrill $7,687,996
14 NORR $5,535,839
15 Morris Architects $3,474,000
16 ACAI Associates $3,000,000
17 Perkins+Will $2,260,000
18 ZGF Architects $1,685,426
19 Solomon Cordwell Buenz $1,570,727
20 Clark Nexsen $1,414,083
21 Epstein $1,368,000
22 LS3P $1,307,775
23 BRPH $892,873
24 Populous $820,970
25 Barge Waggoner Sumner & Cannon $500,000
26 Parkhill, Smith & Cooper $396,976
27 Zyscovich Architects $390,118
28 CTA Architects Engineers $266,008
29 Nadel $253,333
30 Dattner Architects $250,000
31 Guernsey $94,403
32 Architects Hawaii Ltd. $84,000
33 JLG Architects $83,652
34 Paulus, Sokolowski and Sartor $71,200
35 HGA $59,000
36 Beyer Blinder Belle Architects & Planners $34,091
37 GRW $6,791

 

RETURN TO THE GIANTS 300 LANDING PAGE

Tags

Related Stories

| Jun 18, 2014

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

| Jun 18, 2014

Architecture Billings Index shows increase in design activity

The American Institute of Architects reported that the May ABI score was 52.6, up sharply from a mark of 49.6 in April. This score reflects an increase in design activity.

| Jun 17, 2014

Must see: If music were architecture in 27 illustrations

From Miles Davis to Björk to Manu Chao to Bach, Babina visualizes how these sounds will look like if they were visible in the form of architecture.

| Jun 17, 2014

Nation's largest Thai Buddhist temple opens near Boston

The $60 million facility built in honor of King Rama IX of Thailand is the largest Thai Buddhist temple outside of Thailand.

| Jun 17, 2014

U.S. Census report examines why Americans move

According to the U.S. Census Bureau, 35.9 million people moved between 2012 and 2013, meaning that 11.7% of the U.S. population moved in one year. The report seeks to examine why.

| Jun 17, 2014

World's tallest pair of towers to serve as 'environmental catalyst' for China

The Phoenix Towers are expected to reach 1 km, the same height as Adrian Smith and Gordon Gill's Kingdom Tower, but would set a record for multiple towers in one development.

| Jun 16, 2014

6 U.S. cities at the forefront of innovation districts

A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”

| Jun 13, 2014

Gilbane Building Company names new president and chief operating officer

Gilbane Building company hires new president and COO

| Jun 13, 2014

First look: BIG's spiraling museum for watchmaker Audemars Piguet

The glass-and-steel pavilion's spiral structure acts as a storytelling device for the company's history.

| Jun 13, 2014

Grocery stores, restaurants make neighborhoods most desirable [infographic]

John Burns Real Estate Consulting ranks the top 25 housing amenities by generation, based on feedback from more than 20,000 home shoppers.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021