flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 35 Airport Terminal Architecture and A/E Firms

Top 35 Airport Terminal Architecture and A/E Firms

Corgan, HOK, and Gensler top Building Design+Construction’s annual ranking of the nation’s largest airport terminal architecture and A/E firms, as reported in the 2016 Giants 300 Report.

 


By BD+C Editors | July 29, 2016
Top 35 Airport Terminal Architecture and A/E Firms

Concourse J at Miami International Airport. Photo: Martin St-Amant/Wikimedia Commons.

TOP AIRPORT TERMINAL ARCHITECTURE
AND A/E FIRMS
Rank Firm 2015 Revenue
1 Corgan $65,839,265
2 HOK $60,840,000
3 Gensler $44,390,000
4 Gresham, Smith and Partners $25,600,000
5 RS&H $24,300,000
6 Stantec $19,226,351
7 HNTB Corporation $15,998,381
8 HKS $15,309,071
9 Leo A Daly $13,529,252
10 Alliiance $11,260,000
11 Heery International $9,935,444
12 Schenkel & Shultz $8,367,781
13 Skidmore, Owings & Merrill $7,687,996
14 NORR $5,535,839
15 Morris Architects $3,474,000
16 ACAI Associates $3,000,000
17 Perkins+Will $2,260,000
18 ZGF Architects $1,685,426
19 Solomon Cordwell Buenz $1,570,727
20 Clark Nexsen $1,414,083
21 Epstein $1,368,000
22 LS3P $1,307,775
23 BRPH $892,873
24 Populous $820,970
25 Barge Waggoner Sumner & Cannon $500,000
26 Parkhill, Smith & Cooper $396,976
27 Zyscovich Architects $390,118
28 CTA Architects Engineers $266,008
29 Nadel $253,333
30 Dattner Architects $250,000
31 Guernsey $94,403
32 Architects Hawaii Ltd. $84,000
33 JLG Architects $83,652
34 Paulus, Sokolowski and Sartor $71,200
35 HGA $59,000
36 Beyer Blinder Belle Architects & Planners $34,091
37 GRW $6,791

 

RETURN TO THE GIANTS 300 LANDING PAGE

Tags

Related Stories

| Jun 19, 2014

First look: JDS Architects' roller-coaster-like design for Istanbul waterfront development

The development's wavy and groovy design promises unobstructed views of the Marmara Sea for every unit.

| Jun 19, 2014

NCARB study: Architects getting licensed at younger age

A new report from NCARB shows that the median age of people at initial licensure is at a 10 year low.

| Jun 19, 2014

Singapore's 'Tree House' vertical gardens break Guinness World Record

The high-rise development will have a 24,638-sf vertical garden, breaking a Guinness World Record.

| Jun 18, 2014

Design tips for Alzheimer care facilities

A new white paper from the Alzheimer’s Foundation of America and Perkins Eastman details best design practices for residential care settings for individuals living with Alzheimer’s disease. 

| Jun 18, 2014

BSB Design Reinforces Client-Focus Legacy With Recent Changes

His 26-plus year history with BSB Design paired with his client relations skills and operational and organizational acumen make Swift well-suited to perpetuate the legacy of founder Jack Bloodgood: That everyone deserves to live in a home designed by an architect.

| Jun 18, 2014

Largest Passive House structure in the U.S. to be built in Oregon

Orchards at Orenco, a 57-unit affordable housing complex in Hillsboro, Oregon, is the first of a three-phase, three-building complex.

| Jun 18, 2014

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

The skyscraper, which will reach 230 meters and is named Polstjärnan, or "The Pole Star," is to be built in Gothenburg, Sweden. 

| Jun 18, 2014

Study shows walkable urbanism has positive economic impact

Walkable communities have a higher GDP, greater wealth, and higher percentages of college grads, according to a new study by George Washington University.

| Jun 18, 2014

Ware Malcomb names Sorensen Engineering Regional Manager

New hire will oversee firm's civil engineering practice in Los Angeles, San Diego, and Irvine.

| Jun 18, 2014

JLG Architects hires 31 to keep up with 'shale gale' work

Construction boom fueled by 'shale gale' brings rapid growth to North Dakota firm.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021