flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 60 K-12 School Engineering Firms

Top 60 K-12 School Engineering Firms

AECOM, Jacobs, and STV top Building Design+Construction’s annual ranking of the nation’s largest K-12 school sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 1, 2016

The 18,884-sf Collegiate Center addition to Thomas Edison Prepatory High School, Tulsa, Okla., has a floating cantilever study lounge. Two multipurpose rooms double as FEMA-361 safe rooms that can each protect up to 600 persons from winds up to 240 mph. The $4.4 million addition provides 15 distinct spaces. KSQ Design led the Building Team, with the assistance of Wallace Engineering (SE), AEG Engineering, and Crossland Construction (GC). Photo courtesy KSQ Design

 

TOP 60 K-12 SCHOOL ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $50,000,000
2 Jacobs $47,790,000
3 STV $10,618,628
4 KJWW / TTG $9,576,078
5 Wendel $6,321,646
6 Loring Consulting Engineers $6,000,000
7 SSOE Group $5,830,000
8 Dewberry $5,245,499
9 KCI Technologies $5,000,000
10 M/E Engineering $4,688,355
11 Interface Engineering $4,648,596
12 Shive-Hattery $4,444,746
13 Walter P Moore $4,383,887
14 Wiss, Janney, Elstner Associates $3,820,000
15 Coffman Engineers $3,477,402
16 Bridgers & Paxton Consulting Engineers $3,463,318
17 Global Engineering Solutions $3,275,000
18 Simpson Gumpertz & Heger $2,655,000
19 Henderson Engineers $2,609,752
20 Bala Consulting Engineers $2,585,000
21 H.F. Lenz Company $1,939,675
22 Glumac $1,864,154
23 KCL Engineering $1,799,671
24 Heapy Engineering $1,625,957
25 Peter Basso Associates $1,584,834
26 RMF Engineering $1,466,500
27 Thornton Tomasetti $1,398,507
28 Highland Associates $1,300,000
29 JQ Engineering $1,251,500
30 Fishbeck, Thompson, Carr & Huber $1,200,000
31 Vanderweil Engineers $1,087,600
32 CJL Engineering, Inc. $1,080,744
33 I. C. Thomasson Associates $1,057,400
34 RDK Engineers $1,016,785
35 Rist-Frost-Shumway Engineering $1,000,000
36 Karpinski Engineering $1,000,000
37 TLC Engineering for Architecture $960,783
38 P2S Engineering $891,407
39 Graef $845,962
40 Baird, Hampton & Brown $824,059
41 OLA Consulting Engineers $800,034
42 William Tao & Associates $756,935
43 JBA Consulting Engineers $650,667
44 KLH Engineers $604,408
45 KZF Design $592,946
46 Primera Engineers $547,143
47 dbHMS $537,600
48 Wallace Engineering $500,000
49 ME Engineers $500,000
50 Newcomb & Boyd $427,804
51 Davis, Bowen & Friedel $414,817
52 Architectural Engineers $394,865
53 G & W Engineering Corp. $350,090
54 Cardno Haynes Whaley $323,309
55 Spectrum Engineers $141,327
56 CTLGroup $100,000
57 Dunham Associates $100,000
58 GHT Limited $100,000
59 Apogee Consulting Group $70,000
60 Zak Companies $50,807
61 Ghafari Associates $50,000
62 Magnusson Klemencic Associates $20,143
63 Sherlock, Smith & Adams $7,000
64 Luckett & Farley $3,703

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Feb 23, 2011

Call for Entries: 2011 Building Team Awards, Deadline: March 25, 2011

The 14th Annual Building Team Awards recognizes newly built projects that exhibit architectural and construction excellence—and best exemplify the collaboration of the Building Team, including the owner, architect, engineer, and contractor.

| Feb 23, 2011

Green building on the chopping block in House spending measure

Bryan Howard, Legislative Director of the U.S. Green Building Council, blogs about proposed GOP budget cuts that could impact green building in the commercial sector.

| Feb 22, 2011

LEED Volume Program celebrates its 500th certified Pilot Project

More than 500 building projects have certified through the LEED Volume Program since the pilot launched in 2006, according to the U.S. Green Building Council. The LEED Volume Program streamlines the certification process for high-volume property owners and managers, from commercial real estate firms, national retailers and hospitality providers, to local, state and federal governments.

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021