flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 90 Healthcare Architecture Firms

Top 90 Healthcare Architecture Firms

HDR, Stantec, and Perkins+Will top Building Design+Construction’s annual ranking of the nation’s largest healthcare building sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 8, 2016

Advocate Illinois Masonic Medical Center, Center for Advanced Care, Chicago, Ill. Building Team: SmithGroupJJR (architect), Turner Construction (GC), KJWW Engineering (MEP Engineer), Thornton Tomasetti (SE). Photo: Liam Frederick, courtesy of SmithGroupJJR.

TOP 90 HEALTHCARE ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 HDR $189,259,600
2 Stantec $169,505,425
3 Perkins+Will $147,640,000
4 HKS $134,427,510
5 CannonDesign $130,000,000
6 SmithGroupJJR $80,272,000
7 NBBJ $80,000,000
8 CallisonRTKL $69,955,000
9 HGA $67,221,000
10 HOK $59,887,000
11 Perkins Eastman $58,500,000
12 WHR, the healthcare practice group of EYP $55,476,995
13 Gresham, Smith and Partners $46,110,000
14 ZGF Architects $39,611,235
15 Page $32,870,000
16 HMC Architects $31,963,493
17 FKP Architects $30,438,156
18 EwingCole $28,908,000
19 Flad Architects $26,970,000
20 Leo A Daly $25,526,342
21 FreemanWhite $25,476,184
22 Array Architects $24,700,000
23 BWBR $24,582,879
24 Shepley Bulfinch $22,746,403
25 Gensler $20,010,000
26 Heery International $19,512,432
27 Ballinger $18,214,449
28 Skidmore, Owings & Merrill $17,469,702
29 Westlake Reed Leskosky $15,807,461
30 Francis Cauffman $15,286,124
31 Cuningham Group Architecture $13,906,209
32 Lawrence Group $13,740,000
33 NORR $13,395,927
34 Anderson Mikos Architects $12,866,000
35 GBBN Architects $12,790,000
36 Harley Ellis Devereaux $11,800,000
37 VOA Associates $10,677,784
38 CO Architects $10,676,000
39 CTA Architects Engineers $9,769,371
40 Beck Group, The $9,336,239
41 Hord Coplan Macht $9,091,523
42 NAC Architecture $8,633,002
43 Tsoi/Kobus & Associates $8,357,937
44 TEG Architects $8,231,664
45 Payette $7,590,277
46 Harvard Jolly $6,618,833
47 S/L/A/M Collaborative, The $6,113,000
48 Eppstein Uhen Architects $5,534,154
49 RS&H $5,400,000
50 Albert Kahn Associates $5,000,000
51 Parkhill, Smith & Cooper $4,595,988
52 RSP Architects $4,489,000
53 Mascari Warner Architects $4,450,000
54 Rule Joy Trammell + Rubio $4,382,489
55 LPA $4,358,336
56 LS3P $4,356,500
57 Bostwick Design Partnership $3,978,000
58 Goodwyn, Mills and Cawood $3,595,086
59 Diamond Schmitt Architects $3,207,000
60 Wold Architects and Engineers $3,200,000
61 Clark Nexsen $3,150,120
62 Morris Architects $3,108,000
63 Corgan $3,100,000
64 Little $2,964,400
65 Moody Nolan $2,890,000
66 Ware Malcomb $2,765,904
67 Nelson Worldwide Holdings $2,629,748
68 Baskervill $2,552,826
69 LK Architecture $2,500,000
70 TPG Architecture $2,480,000
71 Architects Hawaii Ltd. $2,296,000
72 DLR Group $2,000,000
73 KSQ Design $1,590,768
74 Legat Architects $1,580,000
75 ACAI Associates $1,480,000
76 Marshall Craft Associates $1,441,943
77 JLG Architects $1,378,969
78 Environetics $1,378,715
79 Bergmann Associates $1,286,981
80 Inventure Design Group $1,244,153
81 Kirksey Architecture $1,236,920
82 Becker Morgan Group $1,141,349
83 Margulies Perruzzi Architects $1,131,602
84 LMN Architects $1,109,000
85 Robert A.M. Stern Architects $1,070,000
86 PBK $1,050,000
87 Davis Brody Bond $1,037,242
88 IMC Construction $1,000,000
89 Carrier Johnson + Culture $985,244
90 tvsdesign $980,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

Healthcare Facilities | Jun 27, 2023

A woman-led CM team manages the expansion and renovation of a woman-focused hospital in Nashville

This design-build project includes adding six floors for future growth.

Standards | Jun 26, 2023

New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings

The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

Healthcare Facilities | Jun 5, 2023

Modernizing mental health care in emergency departments: Improving patient outcomes

In today’s mental health crisis, there is a widespread shortage of beds to handle certain populations. Patients may languish in the ED for hours or days before they can be linked to an appropriate inpatient program. 

Healthcare Facilities | Jun 1, 2023

High-rise cancer center delivers new model for oncology care

Atlanta’s 17-story Winship Cancer Institute at Emory Midtown features two-story communities that organize cancer care into one-stop destinations. Designed by Skidmore, Owings & Merrill (SOM) and May Architecture, the facility includes comprehensive oncology facilities—including inpatient beds, surgical capacity, infusion treatment, outpatient clinics, diagnostic imaging, linear accelerators, and areas for wellness, rehabilitation, and clinical research.

Healthcare Facilities | May 19, 2023

A new behavioral health facility in California targets net zero energy

Shortly before Mental Health Awareness Month in May, development and construction firm Skanska announced the topping out of California’s first behavioral health facility—and the largest in the nation—to target net zero energy. Located in Redwood City, San Mateo County, Calif., the 77,610-sf Cordilleras Health System Replacement Project is slated for completion in late 2024.

3D Printing | May 12, 2023

World’s first 3D-printed medical center completed

3D construction printing reached new heights this week as the world’s first 3D-printed medical center was completed in Thailand.

Sustainability | May 11, 2023

Let's build toward a circular economy

Eric Corey Freed, Director of Sustainability, CannonDesign, discusses the values of well-designed, regenerative buildings.

Digital Twin | May 8, 2023

What AEC professionals should know about digital twins

A growing number of AEC firms and building owners are finding value in implementing digital twins to unify design, construction, and operational data.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021