Fluor, Syska, Jacobs top Building Design+Construction's 2013 ranking of the largest data center engineering and engineering/architecture firms in the U.S.


By BD+C Staff | August 20, 2013

 

 

 

 

 

 

 

 

Rank Company 2012 Data Center Revenue ($)
1 Fluor $235,678,900
2 Syska Hennessy Group $36,735,434
3 Jacobs Engineering Group $36,700,000
4 H&A Architects & Engineers $35,427,599
5 URS Corp. $26,229,049
6 Environmental Systems Design $10,575,892
7 Parsons Brinckerhoff $10,300,000
8 H.F. Lenz $7,357,000
9 Science Applications International Corp. $6,760,598
10 AKF Group $6,602,000
11 Clark Nexsen $5,166,474
12 Arup $4,562,202
13 KPFF Consulting Engineers $4,000,000
14 Michael Baker Jr. $3,840,000
15 Vanderweil Engineers $3,761,500
16 Bala Consulting Engineers $3,630,000
17 Glumac $3,142,000
18 Zak Companies $2,648,017
19 RMF Engineering Design $2,500,000
20 Guernsey $2,450,838
21 GHT Limited $2,400,000
22 Degenkolb Engineers $2,156,452
23 Ross & Baruzzini $2,120,725
24 Sparling $1,930,962
25 Wick Fisher White $1,706,660
26 Thornton Tomasetti $1,517,448
27 CCRD Partners $1,400,000
28 Bridgers & Paxton Consulting Engineers $1,349,511
29 RDK Engineers $1,116,000
30 ThermalTech Engineering $1,000,000
31 Affiliated Engineers $971,000
32 Henderson Engineers $944,577
33 Joseph R. Loring & Associates $915,000
34 Haynes Whaley Associates $698,598
35 CJL Engineering $649,643
36 TLC Engineering for Architecture $641,335
37 Mazzetti $636,626
38 WSP USA $556,800
39 Aon Fire Protection Engineering $500,000
39 Dewberry $500,000
39 Dunham Associates $500,000
39 KCI Technologies $500,000
39 TTG $500,000
44 M-E Engineers $300,000
44 Paulus, Sokolowski and Sartor $300,000
46 Interface Engineering $252,504
47 Barge, Waggoner, Sumner and Cannon $200,000
47 OLA Consulting Engineers $200,000
47 Rolf Jensen & Associates $200,000
50 Karpinski Engineering $177,164
51 Apogee Consulting Group $158,000
52 Magnusson Klemencic Associates $156,304
53 Total Building Commissioning $146,395
54 SSOE Group $123,314
55 GRW $121,135
56 Newcomb & Boyd $95,355
57 Allen & Shariff $65,000
58 Brinjac Engineering $58,971
59 CTLGroup $50,000
60 Spectrum Engineers $49,934
61 Eaton Energy Solutions $46,204
62 P2S Engineering $45,830
63 Kamm Consulting $29,084

 

Read the Data Center Giants article   

 

Read BD+C's full Giants 300 Report

Related Stories

Data Centers | Aug 8, 2024

Global edge data center market to cross $300 billion by 2026, says JLL

Technological megatrends, including IoT and generative AI, will require computing power to be closer to data generation and consumption, fueling growth of edge IT infrastructure, according to a new JLL report.

K-12 Schools | Aug 8, 2024

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

A new K-12 STEM Center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively space for students to immerse themselves in STEM subjects. Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. 

Green | Aug 7, 2024

Major cities worldwide set building performance standards

Cities around the world are setting building performance standards (BPS) as a key measure to cut emissions and meet climate targets, according to a report from JLL.

Affordable Housing | Aug 7, 2024

The future of affordable housing may be modular, AI-driven, and made of mushrooms

Demolished in 1989, The Phoenix Ironworks Steel Factory left a five-acre hole in West Oakland, Calif. After sitting vacant for nearly three decades, the site will soon become utilized again in the form of 316 affordable housing units.

Architects | Aug 5, 2024

Mastering the art of project schedule: Expert insights on design and construction

We sat down with two experts in the design field, Ron Dick (Founding Partner and Architect) and Mike Niezer (COO and Architect), to talk about everything you need to know about the entire process.

Education Facilities | Aug 4, 2024

A former supersonic wind tunnel becomes a new educational facility for transportation design

The Mullin Transportation Design Center at ArtCenter College of Design in Pasadena, Calif., provides access for full-scale vehicular models, replicating a professional design studio.

University Buildings | Aug 1, 2024

UC Riverside’s student health center provides an environment on par with major medical centers

The University of California, Riverside's new Student Health and Counseling Center (SHCC) provides a holistic approach to wellness for students throughout the UC Riverside campus. Designed by HGA and delivered through a design-build partnership with Turner Construction Company, SHCC provides healthcare offerings in an environment on par with major medical centers.

Libraries | Aug 1, 2024

How current and future trends are shaping the libraries of tomorrow

Over the last few years, public libraries have transitioned from being buildings that only store and lend books to being fully featured community centers.

MFPRO+ News | Aug 1, 2024

Canada tries massive incentive program to spur new multifamily housing construction

Canada has taken the unprecedented step of offering billions in infrastructure funds to communities in return for eliminating single-family housing zoning.

Government Buildings | Aug 1, 2024

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021