flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Healthcare Sector Engineering Firms [2013 Giants 300 Report]

Top Healthcare Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Jacobs, URS top Building Design+Construction's 2013 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S. 


By BD+C Staff | July 30, 2013
The Benjamin Russell Hospital for Children, Birmingham, Ala. The Building Team i
The Benjamin Russell Hospital for Children, Birmingham, Ala. The Building Team includes: HKS and Giattina Aycock Architecture (architects); KLMK (program manager); Hoar Construction and BE&K Construction Group (contractors); CCRD Partners (MEP engineer); HKS (structural engineer); Walter Schoal Engineering (civil engineer). Photo: HKS, Blake Marvin
Rank Company 2012 Healthcare Revenue ($)
1 AECOM Technology Corp. $180,210,000
2 Jacobs Engineering Group $77,100,000
3 URS Corp. $43,327,332
4 Smith Seckman Reid $40,105,600
5 KPFF Consulting Engineers $30,000,000
6 Affiliated Engineers $28,217,000
7 TTG $24,719,905
8 Parsons Brinckerhoff $22,700,000
9 Dewberry $21,226,702
10 Allen & Shariff $20,300,000
11 Bard, Rao + Athanas Consulting Engineers $19,000,000
12 KJWW Engineering Consultants $18,937,680
13 Mazzetti $18,293,579
14 Degenkolb Engineers $18,070,782
15 CCRD Partners $18,000,000
16 Burns & McDonnell $16,375,000
17 TLC Engineering for Architecture $13,500,933
18 Syska Hennessy Group $11,495,282
19 AKF Group $10,770,000
20 Arup $9,244,250
21 Shive-Hattery $8,381,840
22 Heapy Engineering $8,159,633
23 Zak Companies $7,640,496
24 M-E Engineers $7,200,000
24 RMF Engineering Design $7,200,000
26 Thornton Tomasetti $6,858,953
27 Sparling $6,768,165
28 Buro Happold Consulting Engineers $6,520,000
29 Rolf Jensen & Associates $6,400,000
30 Walter P Moore $6,232,472
31 Michael Baker Jr. $6,200,000
32 SSOE Group $6,192,909
33 Simpson Gumpertz & Heger $5,700,000
34 M/E Engineering $5,671,750
35 Wiss, Janney, Elstner Associates $5,390,000
36 Dunham Associates $5,000,000
37 Vanderweil Engineers $4,846,600
38 Interface Engineering $4,633,068
39 RDK Engineers $4,572,000
40 Karpinski Engineering $4,438,224
41 Clark Nexsen $4,167,051
42 Peter Basso Associates $4,066,000
43 Aon Fire Protection Engineering $4,000,728
44 H.F. Lenz $3,983,000
45 Newcomb & Boyd $3,942,400
46 Bridgers & Paxton Consulting Engineers $3,879,844
47 STV $3,735,000
48 Walker Parking Consultants $3,719,693
49 Science Applications International Corp. $3,621,708
50 Eaton Energy Solutions $3,502,239
51 KCI Technologies $3,500,000
52 Coffman Engineers $3,350,000
53 Spectrum Engineers $3,338,950
54 Glumac $3,296,000
55 WSP USA $2,411,684
56 CJL Engineering $2,390,686
57 Environmental Systems Design $2,383,822
58 KLH Engineers $2,100,000
59 Rist-Frost-Shumway Engineering $2,000,000
60 Apogee Consulting Group $1,582,000
61 Ross & Baruzzini $1,505,511
62 Henderson Engineers $1,469,261
63 Brinjac Engineering $1,367,836
64 GRAEF $1,335,473
65 ThermalTech Engineering $1,300,000
66 Haynes Whaley Associates $1,226,927
67 Bergmann Associates $1,177,000
68 Wick Fisher White $1,137,773
69 Magnusson Klemencic Associates $1,053,699
70 Bala Consulting Engineers $850,000
71 OLA Consulting Engineers $750,000
72 CTLGroup $700,000
72 French & Parrello Associates $700,000
74 Primera Engineers $620,000
75 FBA Engineering $400,000
76 Joseph R. Loring & Associates $280,000
77 G&W Engineering $232,000
78 Wallace Engineering $225,000
79 Stanley Consultants $219,880
80 Davis, Bowen & Friedel $187,632
81 Paulus, Sokolowski and Sartor $150,000
82 P2S Engineering $76,079
83 Total Building Commissioning $46,144
84 Kamm Consulting $21,025
85 Guernsey $11,668

 

Read the Healthcare Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Healthcare Facilities | Oct 8, 2024

Herzog & de Meuron completes Switzerland’s largest children’s hospital

The new University Children’s Hospital Zurich features 114 rooftop patient rooms designed like wooden cottages with their own roofs. The project also includes a research and teaching facility.

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Brick and Masonry | Oct 7, 2024

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.

Glass and Glazing | Oct 7, 2024

Pattern language: An exploration of digital printing on architectural glazing

Architectural Glazing has long been an important expressive tool which, when selected and detailed thoughtfully, can contribute to the successful transformation of architectural concepts to reality.

University Buildings | Oct 4, 2024

Renovations are raising higher education campuses to modern standards

AEC higher ed Giants report working on a variety of building types, from performing arts centers and libraries to business schools. Hybrid learning is seemingly here to stay. And where possible, these projects address wellness and mental health concerns.

AEC Tech | Oct 3, 2024

4 ways AI impacts building design beyond dramatic imagery

Kristen Forward, Design Technology Futures Leader, NBBJ, shows four ways the firm is using AI to generate value for its clients.

Laboratories | Oct 2, 2024

Trends in scientific research environments: Q&A with Flad's Matt McCord

As part of an ongoing series, Matt McCord, AIA, NCARB, LEED AP BD+C, Associate Principal with Flad Architects, discusses the future of the scientific workplace.

Museums | Oct 1, 2024

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

Data Centers | Oct 1, 2024

10 biggest impacts to the data center market in 2024–2025

While AI sends the data center market into the stratosphere, the sector’s accelerated growth remains impacted by speed-to-market demands, supply chain issues, and design innovation necessities.

Designers | Oct 1, 2024

Global entertainment design firm WATG acquires SOSH Architects

Entertainment design firm WATG has acquired SOSH Architects, an interior design and planning firm based in Atlantic City, N.J. 

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021