flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Hotel Engineering Firms [2013 Giants 300 Report]

Top Hotel Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff

 

 

 

 

 

 

 

 

Rank Company 2012 Hospitality Revenue ($)
1 AECOM Technology Corp. $100,190,000
2 Parsons Brinckerhoff $28,900,000
3 Buro Happold Consulting Engineers $16,165,000
4 Rolf Jensen & Associates $7,600,000
5 Thornton Tomasetti $7,218,731
6 KPFF Consulting Engineers $6,000,000
7 Arup $5,527,371
8 Michael Baker Jr. $4,340,000
9 Wiss, Janney, Elstner Associates $2,880,000
10 WSP USA $2,696,642
11 Simpson Gumpertz & Heger $2,200,000
11 Aon Fire Protection Engineering $2,000,000
13 Clark Nexsen $1,450,223
14 Vanderweil Engineers $1,272,800
15 Glumac $1,252,000
16 Magnusson Klemencic Associates $1,239,089
17 Bala Consulting Engineers $1,200,000
18 M/E Engineering $1,134,350
19 TLC Engineering for Architecture $973,982
20 Environmental Systems Design $971,399
21 M-E Engineers $900,000
22 H&A Architects & Engineers $863,474
23 Paulus, Sokolowski and Sartor $750,000
24 AKF Group $739,000
25 KJWW Engineering Consultants $651,984
26 KLH Engineers $524,215
27 Walter P Moore $495,971
28 GHT Limited $450,000
29 Science Applications International Corp. $426,888
30 Interface Engineering $425,984
31 Allen & Shariff $400,000
32 Walker Parking Consultants $360,240
33 Bridgers & Paxton Consulting Engineers $337,378
34 Haynes Whaley Associates $301,003
35 CTLGroup $300,000
36 RDK Engineers $281,000
37 Henderson Engineers $272,858
38 H.F. Lenz $272,000
39 Smith Seckman Reid $270,470
40 Syska Hennessy Group $265,788
41 Primera Engineers $211,000
42 Coffman Engineers $200,000
43 Joseph R. Loring & Associates $155,000
44 Wallace Engineering $150,000
45 GRAEF $143,034
46 Dunham Associates $125,000
47 Karpinski Engineering $109,499
48 Barge, Waggoner, Sumner and Cannon $100,000
48 ThermalTech Engineering $100,000
50 Heapy Engineering $96,897
51 Spectrum Engineers $89,390
52 Newcomb & Boyd $87,850
53 TTG $85,000
54 Mazzetti $57,094
55 Sparling $40,399
56 Dewberry $33,605
57 FBA Engineering $30,000
58 Degenkolb Engineers $14,192
59 Davis, Bowen & Friedel $10,521
60 Kamm Consulting $3,500
61 Shive-Hattery $3,055
62 French & Parrello Associates $3,000

 

Read the Hotel Giants article 

 

Read BD+C's full Giants 300 Report

Related Stories

| Oct 13, 2010

Residences bring students, faculty together in the Middle East

A new residence complex is in design for United Arab Emirates University in Al Ain, UAE, near Abu Dhabi. Plans for the 120-acre mixed-use development include 710 clustered townhomes and apartments for students and faculty and common areas for community activities.

| Oct 13, 2010

HQ renovations aim for modern look

Gerner Kronick + Valcarcel Architects’ renovations to the Commonwealth Bank of Australia’s New York City headquarters will feature a reworked reception lobby with back-painted glass, silk-screened logos, and a video wall.

| Oct 13, 2010

New health center to focus on education and awareness

Construction is getting pumped up at the new Anschutz Health and Wellness Center at the University of Colorado, Denver. The four-story, 94,000-sf building will focus on healthy lifestyles and disease prevention.

| Oct 13, 2010

Community center under way in NYC seeks LEED Platinum

A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.

| Oct 13, 2010

Community college plans new campus building

Construction is moving along on Hudson County Community College’s North Hudson Campus Center in Union City, N.J. The seven-story, 92,000-sf building will be the first higher education facility in the city.

| Oct 13, 2010

Bookworms in Silver Spring getting new library

The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.

| Oct 13, 2010

County building aims for the sun, shade

The 187,032-sf East County Hall of Justice in Dublin, Calif., will be oriented to take advantage of daylighting, with exterior sunshades preventing unwanted heat gain and glare. The building is targeting LEED Silver. Strong horizontal massing helps both buildings better match their low-rise and residential neighbors.

| Oct 12, 2010

Holton Career and Resource Center, Durham, N.C.

27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Richmond CenterStage, Richmond, Va.

27th Annual Reconstruction Awards—Bronze Award. The Richmond CenterStage opened in 1928 in the Virginia capital as a grand movie palace named Loew’s Theatre. It was reinvented in 1983 as a performing arts center known as Carpenter Theatre and hobbled along until 2004, when the crumbling venue was mercifully shuttered.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021