Rank Company 2012 K-12 Revenue ($)
1 AECOM Technology Corp. $100,150,000
2 URS Corp. $55,927,778
3 STV $45,937,000
4 Jacobs Engineering Group $36,550,000
5 Parsons Brinckerhoff $19,100,000
6 TTG $9,985,300
7 Shive-Hattery $7,379,425
8 BRPH $4,900,000
9 KCI Technologies $4,200,000
10 Dewberry $3,852,971
11 KJWW Engineering Consultants $3,643,844
12 Thornton Tomasetti $3,589,317
13 Wiss, Janney, Elstner Associates $3,570,000
14 Joseph R. Loring & Associates $3,500,000
15 KPFF Consulting Engineers $3,000,000
16 M/E Engineering $2,779,150
17 Interface Engineering $2,745,564
18 Simpson Gumpertz & Heger $2,700,000
19 CJL Engineering $2,507,621
20 Rist-Frost-Shumway Engineering $2,500,000
21 FBA Engineering $2,405,000
22 Allen & Shariff $2,200,000
23 Coffman Engineers $2,140,000
24 Heapy Engineering $2,086,975
25 Bridgers & Paxton Consulting Engineers $2,024,266
26 RDK Engineers $1,975,000
27 AKF Group $1,576,000
28 Vanderweil Engineers $1,553,500
29 French & Parrello Associates $1,500,000
30 SSOE Group $1,473,611
31 Glumac $1,404,000
32 Peter Basso Associates $1,400,000
33 Wallace Engineering $1,350,000
34 Henderson Engineers $1,118,069
35 Brinjac Engineering $1,080,748
36 Clark Nexsen $1,063,791
37 G&W Engineering $1,000,000
37 KLH Engineers $1,000,000
37 WSP USA $1,000,000
40 TLC Engineering for Architecture $933,884
41 H.F. Lenz $847,000
42 Davis, Bowen & Friedel $833,642
43 Sparling $785,356
44 Primera Engineers $748,000
45 M-E Engineers $700,000
46 Environmental Systems Design $610,185
47 Paulus, Sokolowski and Sartor $500,000
48 RMF Engineering Design $500,000
49 OLA Consulting Engineers $400,000
50 Rolf Jensen & Associates $400,000
51 Karpinski Engineering $379,369
52 Bala Consulting Engineers $350,000
53 Eaton Energy Solutions $312,320
54 Wick Fisher White $300,697
55 Apogee Consulting Group $278,000
56 Arup $251,475
57 Aon Fire Protection Engineering $200,000
57 GHT Limited $200,000
59 Mazzetti $182,262
60 Dunham Associates $150,000
61 GRW $135,860
62 Magnusson Klemencic Associates $109,780
63 Science Applications International Corp. $109,282
64 Barge, Waggoner, Sumner and Cannon $100,000
64 CTLGroup $100,000
66 Degenkolb Engineers $97,850
67 P2S Engineering $86,100
68 Spectrum Engineers $83,820
69 Affiliated Engineers $55,000
70 Kamm Consulting $45,861
71 Newcomb & Boyd $42,814
72 Haynes Whaley Associates $34,139
73 Walter P Moore $29,068

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Mar 19, 2012

Smith Carter joins forces with Genivar

Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021