flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top K-12 School Sector Engineering Firms [2013 Giants 300 Report]

Top K-12 School Sector Engineering Firms [2013 Giants 300 Report]

AECOM, URS, STV top Building Design+Construction's 2013 ranking of the largest K-12 school sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 K-12 Revenue ($)
1 AECOM Technology Corp. $100,150,000
2 URS Corp. $55,927,778
3 STV $45,937,000
4 Jacobs Engineering Group $36,550,000
5 Parsons Brinckerhoff $19,100,000
6 TTG $9,985,300
7 Shive-Hattery $7,379,425
8 BRPH $4,900,000
9 KCI Technologies $4,200,000
10 Dewberry $3,852,971
11 KJWW Engineering Consultants $3,643,844
12 Thornton Tomasetti $3,589,317
13 Wiss, Janney, Elstner Associates $3,570,000
14 Joseph R. Loring & Associates $3,500,000
15 KPFF Consulting Engineers $3,000,000
16 M/E Engineering $2,779,150
17 Interface Engineering $2,745,564
18 Simpson Gumpertz & Heger $2,700,000
19 CJL Engineering $2,507,621
20 Rist-Frost-Shumway Engineering $2,500,000
21 FBA Engineering $2,405,000
22 Allen & Shariff $2,200,000
23 Coffman Engineers $2,140,000
24 Heapy Engineering $2,086,975
25 Bridgers & Paxton Consulting Engineers $2,024,266
26 RDK Engineers $1,975,000
27 AKF Group $1,576,000
28 Vanderweil Engineers $1,553,500
29 French & Parrello Associates $1,500,000
30 SSOE Group $1,473,611
31 Glumac $1,404,000
32 Peter Basso Associates $1,400,000
33 Wallace Engineering $1,350,000
34 Henderson Engineers $1,118,069
35 Brinjac Engineering $1,080,748
36 Clark Nexsen $1,063,791
37 G&W Engineering $1,000,000
37 KLH Engineers $1,000,000
37 WSP USA $1,000,000
40 TLC Engineering for Architecture $933,884
41 H.F. Lenz $847,000
42 Davis, Bowen & Friedel $833,642
43 Sparling $785,356
44 Primera Engineers $748,000
45 M-E Engineers $700,000
46 Environmental Systems Design $610,185
47 Paulus, Sokolowski and Sartor $500,000
48 RMF Engineering Design $500,000
49 OLA Consulting Engineers $400,000
50 Rolf Jensen & Associates $400,000
51 Karpinski Engineering $379,369
52 Bala Consulting Engineers $350,000
53 Eaton Energy Solutions $312,320
54 Wick Fisher White $300,697
55 Apogee Consulting Group $278,000
56 Arup $251,475
57 Aon Fire Protection Engineering $200,000
57 GHT Limited $200,000
59 Mazzetti $182,262
60 Dunham Associates $150,000
61 GRW $135,860
62 Magnusson Klemencic Associates $109,780
63 Science Applications International Corp. $109,282
64 Barge, Waggoner, Sumner and Cannon $100,000
64 CTLGroup $100,000
66 Degenkolb Engineers $97,850
67 P2S Engineering $86,100
68 Spectrum Engineers $83,820
69 Affiliated Engineers $55,000
70 Kamm Consulting $45,861
71 Newcomb & Boyd $42,814
72 Haynes Whaley Associates $34,139
73 Walter P Moore $29,068

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021