flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Office Sector Engineering Firms [2013 Giants 300 Report]

Top Office Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Jacobs top Building Design+Construction's 2013 ranking of the largest office sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 Office Revenue ($)
1 AECOM Technology Corp. $830,320,000
2 Parsons Brinckerhoff $146,400,000
3 Jacobs Engineering Group $95,180,000
4 Burns & McDonnell $82,020,000
5 Thornton Tomasetti $50,861,467
6 Michael Baker Jr. $50,720,000
7 WSP USA $48,500,162
8 Arup $32,355,607
9 Buro Happold Consulting Engineers $28,720,000
10 AKF Group $26,917,000
11 Allen & Shariff $23,000,000
12 Syska Hennessy Group $22,537,724
13 URS Corp. $22,004,616
14 Environmental Systems Design $19,528,391
15 Science Applications International Corp. $18,346,871
16 Dewberry $16,371,636
17 Wiss, Janney, Elstner Associates $13,850,000
18 GHT Limited $12,944,469
19 Glumac $12,535,000
20 Haynes Whaley Associates $10,928,961
21 Magnusson Klemencic Associates $10,597,664
22 Vanderweil Engineers $10,485,700
23 KPFF Consulting Engineers $10,000,000
24 BRPH $9,800,000
25 RDK Engineers $9,578,000
26 Simpson Gumpertz & Heger $8,500,000
27 Clark Nexsen $6,169,304
28 Rolf Jensen & Associates $6,000,000
29 H.F. Lenz $5,357,000
30 H&A Architects & Engineers $5,239,486
31 Joseph R. Loring & Associates $5,150,000
32 Bridgers & Paxton Consulting Engineers $4,807,632
33 ThermalTech Engineering $3,800,000
34 CJL Engineering $3,521,065
35 Smith Seckman Reid $3,508,905
36 STV $3,505,000
37 SSOE Group $3,380,239
38 Newcomb & Boyd $3,371,710
39 Heapy Engineering $3,362,333
40 Sparling $3,275,463
41 TTG $3,203,930
42 Bala Consulting Engineers $3,160,000
43 Walker Parking Consultants $3,109,222
44 M-E Engineers $3,100,000
45 Henderson Engineers $3,014,367
46 Hixson Architecture, Engineering, Interiors $3,000,000
47 TLC Engineering for Architecture $2,991,691
48 Interface Engineering $2,962,807
49 Coffman Engineers $2,825,000
50 Walter P Moore $2,681,402
51 KLH Engineers $2,600,000
52 KJWW Engineering Consultants $2,352,444
53 Karpinski Engineering $2,179,216
54 Aon Fire Protection Engineering $2,000,000
55 Primera Engineers $1,998,000
56 Affiliated Engineers $1,968,000
57 Dunham Associates $1,750,000
58 Spectrum Engineers $1,745,854
59 Peter Basso Associates $1,700,000
60 GRAEF $1,572,073
61 CTLGroup $1,500,000
61 Middough $1,500,000
61 Paulus, Sokolowski and Sartor $1,500,000
64 Degenkolb Engineers $1,497,172
65 Shive-Hattery $1,480,615
66 Wick Fisher White $1,462,851
67 French & Parrello Associates $1,400,000
68 Brinjac Engineering $1,199,912
69 Zak Companies $1,151,229
70 M/E Engineering $1,134,350
71 KCI Technologies $1,000,000
71 OLA Consulting Engineers $1,000,000
73 Kamm Consulting $947,456
74 Mazzetti $945,119
75 Bergmann Associates $921,000
76 Bard, Rao + Athanas Consulting Engineers $900,000
77 Wallace Engineering $825,000
78 CCRD Partners $700,000
79 Eaton Energy Solutions $613,024
80 GRW $542,150
81 G&W Engineering $450,000
82 P2S Engineering $383,806
83 Davis, Bowen & Friedel $284,349
84 Guernsey $241,535
85 Ross & Baruzzini $225,000
86 RMF Engineering Design $75,000
87 Apogee Consulting Group $59,000
88 Total Building Commissioning $43,810
89 Stanley Consultants $10,107
90 FBA Engineering $10,000

 

Read the Office Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021