flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Office Sector Engineering Firms [2013 Giants 300 Report]

Top Office Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Jacobs top Building Design+Construction's 2013 ranking of the largest office sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 Office Revenue ($)
1 AECOM Technology Corp. $830,320,000
2 Parsons Brinckerhoff $146,400,000
3 Jacobs Engineering Group $95,180,000
4 Burns & McDonnell $82,020,000
5 Thornton Tomasetti $50,861,467
6 Michael Baker Jr. $50,720,000
7 WSP USA $48,500,162
8 Arup $32,355,607
9 Buro Happold Consulting Engineers $28,720,000
10 AKF Group $26,917,000
11 Allen & Shariff $23,000,000
12 Syska Hennessy Group $22,537,724
13 URS Corp. $22,004,616
14 Environmental Systems Design $19,528,391
15 Science Applications International Corp. $18,346,871
16 Dewberry $16,371,636
17 Wiss, Janney, Elstner Associates $13,850,000
18 GHT Limited $12,944,469
19 Glumac $12,535,000
20 Haynes Whaley Associates $10,928,961
21 Magnusson Klemencic Associates $10,597,664
22 Vanderweil Engineers $10,485,700
23 KPFF Consulting Engineers $10,000,000
24 BRPH $9,800,000
25 RDK Engineers $9,578,000
26 Simpson Gumpertz & Heger $8,500,000
27 Clark Nexsen $6,169,304
28 Rolf Jensen & Associates $6,000,000
29 H.F. Lenz $5,357,000
30 H&A Architects & Engineers $5,239,486
31 Joseph R. Loring & Associates $5,150,000
32 Bridgers & Paxton Consulting Engineers $4,807,632
33 ThermalTech Engineering $3,800,000
34 CJL Engineering $3,521,065
35 Smith Seckman Reid $3,508,905
36 STV $3,505,000
37 SSOE Group $3,380,239
38 Newcomb & Boyd $3,371,710
39 Heapy Engineering $3,362,333
40 Sparling $3,275,463
41 TTG $3,203,930
42 Bala Consulting Engineers $3,160,000
43 Walker Parking Consultants $3,109,222
44 M-E Engineers $3,100,000
45 Henderson Engineers $3,014,367
46 Hixson Architecture, Engineering, Interiors $3,000,000
47 TLC Engineering for Architecture $2,991,691
48 Interface Engineering $2,962,807
49 Coffman Engineers $2,825,000
50 Walter P Moore $2,681,402
51 KLH Engineers $2,600,000
52 KJWW Engineering Consultants $2,352,444
53 Karpinski Engineering $2,179,216
54 Aon Fire Protection Engineering $2,000,000
55 Primera Engineers $1,998,000
56 Affiliated Engineers $1,968,000
57 Dunham Associates $1,750,000
58 Spectrum Engineers $1,745,854
59 Peter Basso Associates $1,700,000
60 GRAEF $1,572,073
61 CTLGroup $1,500,000
61 Middough $1,500,000
61 Paulus, Sokolowski and Sartor $1,500,000
64 Degenkolb Engineers $1,497,172
65 Shive-Hattery $1,480,615
66 Wick Fisher White $1,462,851
67 French & Parrello Associates $1,400,000
68 Brinjac Engineering $1,199,912
69 Zak Companies $1,151,229
70 M/E Engineering $1,134,350
71 KCI Technologies $1,000,000
71 OLA Consulting Engineers $1,000,000
73 Kamm Consulting $947,456
74 Mazzetti $945,119
75 Bergmann Associates $921,000
76 Bard, Rao + Athanas Consulting Engineers $900,000
77 Wallace Engineering $825,000
78 CCRD Partners $700,000
79 Eaton Energy Solutions $613,024
80 GRW $542,150
81 G&W Engineering $450,000
82 P2S Engineering $383,806
83 Davis, Bowen & Friedel $284,349
84 Guernsey $241,535
85 Ross & Baruzzini $225,000
86 RMF Engineering Design $75,000
87 Apogee Consulting Group $59,000
88 Total Building Commissioning $43,810
89 Stanley Consultants $10,107
90 FBA Engineering $10,000

 

Read the Office Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021