flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two identical Kohn Pederson Fox office towers may be headed to Wacker Drive

High-rise Construction

Two identical Kohn Pederson Fox office towers may be headed to Wacker Drive

Murphy Development Group is looking for tenants for the $800 million project.


By David Malone, Associate Editor | November 3, 2016

Rendering courtesy of Kohn Pederson Fox

Two parcels of land along Wacker Drive, one occupied by a small park and plaza and another by a parking lot, could soon be the site of twin 48-story office towers from architect Kohn Pederson Fox and developer Murphy Development Group.

Containing 1.2 million sf of office space each, the two land parcels, 301 S. Wacker and 321 S. Wacker, are located just south of the Willis Tower, Curbed Chicago reports. According to Crain’s, Murphy Development Group expects the project to cost more than $800 million. Closing on the two parcels of land with is expected to occur before the end of the year, but specific terms of the deal between Murphy Development Group and InSite Real Estate are not known.

Kohn Pederson Fox has already completed design work on the project and zoning is already in place. Once a deal is signed, construction is expected to take less than two years. However, neither tower is expected to begin construction until tenants are secured.

Related Stories

High-rise Construction | Dec 20, 2017

Another record year for high-rise construction

More than 140 skyscrapers were completed across the globe this year, including 15 supertall towers.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

High-rise Construction | Sep 8, 2017

CTBUH determines fastest elevators and longest runs in the world in new TBIN Study

When it comes to the tallest skyscrapers in the world, the vertical commute in the building becomes just as important as the horizontal commute through the city.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Mixed-Use | Aug 30, 2017

A 50-acre waterfront redevelopment gets under way in Tampa

Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.

Codes and Standards | Aug 7, 2017

Council on Tall Buildings and Urban Habitat to create standards to measure floor area

The standards will examine existing codes and regulations to find where they are too broad or contentious.

High-rise Construction | Aug 1, 2017

Construction on the world’s skinniest tower halts due to ballooning costs

The planned 82-story tower has stalled after completing just 20 stories.

Wood | Jun 13, 2017

The first timber high-rise in the U.S. set for construction in Portland

The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.

Office Buildings | May 30, 2017

How tech companies are rethinking the high-rise workplace

Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021