flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two new residential towers set to rise in Nashville

Multifamily Housing

Two new residential towers set to rise in Nashville

Goettsch Partners is designing the buildings.


By David Malone, Associate Editor | April 20, 2021
Alcove and Prime in downtown Nashville

All renderings courtesy Goettsch Partners/Giarratana LLC

Two new residential towers will soon grace the Nashville skyline. Alcove at 900 Church, a 34-story, 356-unit building, and Prime at 801 Church, a 38-story, 350-unit building, will be built concurrently on nearly an acre of land in downtown Nashville directly across from the mixed-use development Nashville Yards.

Alcove at 900 Church will include a glass facade and feature a stacked cube aesthetic. It will rise 416 feet. Prime at 801 Church has a smaller footprint than Alcove but retains the stacked glass cube style. Alcove will not feature any parking while Prime will include a 511-space parking garage. Prime will also include two retail spaces totaling approximately 2,600-sf. Spread across the two towers will be balconies, terraces, and a glass-bottomed cantilevered swimming pool.

 

Alcove Pool Deck

 

Both towers will feature elevator systems from Mitsubishi Electric US. Elevators will be equipped with the Mitsubishi Electric Sigma AI 2200C Destination Oriented Allocation System and Mitsubishi Electric’s touch-free elevator call system smartphone app. The system allows residents to call an elevator wirelessly prior to arriving at the elevator lobby, eliminating the need to directly interact with the elevator fixtures.

Both Alcove and Prime are being designed by Goettsch Partners and built by AECOM Hunt. Giarratana LLC is the developer. The towers are scheduled for completion in late 2023.

 

Alcove Terrace

Related Stories

| Apr 26, 2019

Organized Living Offers ‘Century Gray’ Product Finish for Multifamily Storage Systems

Organized Living releases new color option for apartment and condominium storage systems.

Multifamily Housing | Apr 23, 2019

Recharging Edison’s batteries

America’s greatest inventor would have appreciated this project team’s ingenuity and persistence.

Multifamily Housing | Apr 17, 2019

Multifamily real estate trends for 2019 and beyond

Boomers are on the move and Millennials are seeing upward mobility, but issues with affordability and housing product mix persist.

Multifamily Housing | Apr 16, 2019

Multifamily rentals are still alive and kickin’

Apartments are being built, and in goodly number. But not enough of it is affordable.

Multifamily Housing | Apr 12, 2019

NYC officials partner with nonprofit to build modular affordable housing

Thorobird and BACDYS partner with Brooklyn’s FullStack Modular on project.

Multifamily Housing | Apr 11, 2019

St. Augustine Terrace brings affordable housing to the Bronx

Magnusson Architecture + Planning designed the building.

Multifamily Housing | Apr 8, 2019

Priced to sell: DUMBO condo development offers starter units in luxury setting

Designed by ODA New York, 98 Front Street will be loaded with amenities like a salt water pool, co-working spaces, and indoor and outdoor fitness centers.

Reconstruction & Renovation | Apr 5, 2019

Historic Corrigan Tower in Dallas becomes 1900 Pacific Residences

The 18-story Corrigan Tower in the Dallas’s historic downtown district is now a thriving 150-unit apartment residence community.

Multifamily Housing | Apr 3, 2019

Multifamily rent growth hits two-year high in February, rising 3.6%

A survey of 127 major U.S. real estate markets by Yardi Matrix shows no signs of slowing for multifamily rental demand.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021