flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two residential towers break ground in Chicago’s Lakeshore East

High-rise Construction

Two residential towers break ground in Chicago’s Lakeshore East

bKL Architecture designed the towers.


By David Malone, Associate Editor | September 19, 2019
CIrrus condo tower entrance

All renderings courtesy Lendlease

Cirrus, a 47-story, 363-unit luxury condominium tower, and Cascade, an adjacent 37-story, 503-unit rental tower, recently broke ground in Chicago’s Lakeshore East community. The two towers, along with Cascade Park, a publicly accessible green space that will provide an activated connection to the lakefront and Chicago Riverwalk, are being developed simultaneously by Lendlease and Magellan Development Group.

Cirrus floor plans include one-, two-, three-, and four-bedroom layouts as well as two townhome residences at ground level and 15 penthouse residences, including one duplex, located on floors 42-47. Units will range in size from 650 sf to over 3,000 sf. All residences include floor-to-ceiling windows and kitchens with quartzite countertops, tile backsplashes, Bosch built-in recirculating hoods, and Franke stainless steel undermount sinks with disposal.

 

Cirrus condo towerCirrus Condominium Tower.

 

The Cirrus lobby features a wall of east-facing, floor-to-ceiling windows adjacent to a seating area and open, circular fireplace. The lobby connects to an outdoor terrace and separate pool deck with lounge seating, adjacent indoor wet lounge, cabanas, and transparent glass partitions. Other amenities include private workspaces and conference rooms, a social lounge with fireplace, and a conservatory overlooking Cascade Park. A wine cellar with tasting room, separate show and prep kitchens with a dining area and chef’s corner lounge, and an east-facing outdoor terrace with barbecue and fire pit on the 41st floor round out the building’s 48,000-sf of amenity space.

 

See Also: 2019 Multifamily Giants Report: Apartment construction keeps moving along, but affordable housing lags behind

 

Cirrus and Cascade shared indoor poolCirrus and Cascade shared indoor pool.

 

Residents of both Cirrus and Cascade will have access to an indoor lap pool, a heat therapy pool and splash pad, a children’s playroom, a fitness center with adjacent yoga/spin studio, an HIIT training area with locker rooms, massage and steam rooms, a game room with a golf simulator and billiards, a screening room, a music room, a multi-purpose community room, a dog-washing station, and an indoor dog run. Both towers will include deeded, below-grade parking spaces.

 

Cirrus and Cascade towersCirrus and Cascade towers.

 

Additionally, all residents will enjoy access to Cascade Park, a 0.8 acre green space designed by Claude Cormier + Associés. The park will slope down from Harbor Drive to the tower’s base, creating a new connection to the Lakefront Trail and Chicago Riverwalk.

Cirrus and Cascade are the first of three towers that Lendlease and Magellan plan to develop at the northeast corner of Lakeshore East. The first residences are scheduled to deliver in fall 2021.

 

Cirrus outdoor poolCirrus outdoor pool.

 

Cirrus social loungeCirrus social lounge.

 

Cirrus lobbyCirrus Tower lobby.

 

Two-bedroom two bath residenceTwo-bedroom/two-bath residence in Cirrus Tower.

Related Stories

Sustainability | Oct 4, 2016

One World Trade Center officially awarded LEED Gold certification

The skyscraper received the certification despite a setback caused by Hurricane Sandy.

High-rise Construction | Sep 23, 2016

A massive redevelopment in Tokyo reunites developer and architect

Mitsui Fudosan and SOM join forces to create OH-1, a mixed-use complex with a prominent public square.

High-rise Construction | Sep 12, 2016

Bangkok’s tallest tower is also one of its most unique

At 1,030 feet tall, MahaNakhon Tower’s height is only outdone by its arresting design.

Mixed-Use | Sep 9, 2016

Rolled book scroll-inspired mixed-use project from Aedas planned for Chongqing, China

With a bookstore at the heart of the development, the project looks to exemplify an ancient Chinese proverb that says “knowledge brings wealth.”

Office Buildings | Sep 8, 2016

Taipei’s Lè Architecture, designed by Aedas, is almost complete

The 18-story building is designed to resemble a moss-covered river pebble in Taipei’s Nangang District.

High-rise Construction | Sep 8, 2016

Construction on the tallest residential tower in western Europe could start early next year

China’s Greenland Group is the developer of four of the world’s 10 largest skyscrapers

High-rise Construction | Sep 8, 2016

Lendlease to build Aykon London One Tower

Damac, the Dubai-based developer of the project, selected the Australian property construction and development company to build the tower.

High-rise Construction | Sep 7, 2016

Shenzhen Kingkey Group submits re-planning package for what could become China’s tallest tower

The high-rise, H700 Shenzhen Tower, is one of a group of towers being built in Shenzhen’s Caiwuwei financial and commercial area.

High-rise Construction | Sep 6, 2016

Peddle Thorp Architects' solar-powered Melbourne high-rise looks to go off the grid

The skyscraper would be the first in Australia to incorporate solar cells in its façade.

High-rise Construction | Aug 22, 2016

Tall buildings with a twist: CTBUH ranks the world’s 28 tallest twisting towers

In 2005, the Turning Toroso, designed by Santiago Calatrava, was completed, making it the first twisting skyscraper in the world.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021