flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two Thornton Tomasetti projects receive 2012 International Architecture Awards for Best Global Design

Two Thornton Tomasetti projects receive 2012 International Architecture Awards for Best Global Design

The awards, presented by the Chicago Athenaeum Museum of Architecture Design, the European Center for Architecture Art Design, and Urban Studies and Metropolitan Arts Press, Ltd., recognize excellence in architecture and urban planning.


By Posted by Tim Gregorski, Senior Editor | November 7, 2012

Thornton Tomasetti, the international engineering firm, announces that two projects for which it provided structural engineering services – Palazzo Lombardia in Milan, Italy, and the Solar Canopy/EV Dock in Chicago, Ill. –  have received the coveted International Architecture Awards. The projects were among 80 chosen for the honor.

The awards, presented by the Chicago Athenaeum Museum of Architecture Design, the European Center for Architecture Art Design, and Urban Studies and Metropolitan Arts Press, Ltd., recognize excellence in architecture and urban planning.

The 40-story Palazzo Lombardia is the tallest building in Italy upon its completion in 2011. The building serves as headquarters for the Lombardy Regional Government. Thornton Tomasetti provided structural engineering services to Pei Cobb Freed and Partners.

Palazzo Lombardia includes a nine-story curvilinear podium composed of six independent buildings separated by expansion joints, and a large public plaza enclosed by an arched tubular lamella roof clad with an ETFE pillow membrane.

The Solar Canopy/EV Dock, a prototype structure completed in 2011, is designed to harvest solar energy for powering electric/hybrid vehicles. The dock is used by the City of Chicago to charge its stock of cars.

Thornton Tomasetti was responsible for the structural design and detailing of steel and connections for Adrian Smith + Gordon Gill Architecture. The 11-foot tall structure has a steel superstructure and concrete foundation with a 300-SF canopy. Attached photovoltaic panels provide space for two cars. The unit can function singularly or linked with other canopies. +

Related Stories

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021