flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two Thornton Tomasetti projects receive 2012 International Architecture Awards for Best Global Design

Two Thornton Tomasetti projects receive 2012 International Architecture Awards for Best Global Design

The awards, presented by the Chicago Athenaeum Museum of Architecture Design, the European Center for Architecture Art Design, and Urban Studies and Metropolitan Arts Press, Ltd., recognize excellence in architecture and urban planning.


By Posted by Tim Gregorski, Senior Editor | November 7, 2012

Thornton Tomasetti, the international engineering firm, announces that two projects for which it provided structural engineering services – Palazzo Lombardia in Milan, Italy, and the Solar Canopy/EV Dock in Chicago, Ill. –  have received the coveted International Architecture Awards. The projects were among 80 chosen for the honor.

The awards, presented by the Chicago Athenaeum Museum of Architecture Design, the European Center for Architecture Art Design, and Urban Studies and Metropolitan Arts Press, Ltd., recognize excellence in architecture and urban planning.

The 40-story Palazzo Lombardia is the tallest building in Italy upon its completion in 2011. The building serves as headquarters for the Lombardy Regional Government. Thornton Tomasetti provided structural engineering services to Pei Cobb Freed and Partners.

Palazzo Lombardia includes a nine-story curvilinear podium composed of six independent buildings separated by expansion joints, and a large public plaza enclosed by an arched tubular lamella roof clad with an ETFE pillow membrane.

The Solar Canopy/EV Dock, a prototype structure completed in 2011, is designed to harvest solar energy for powering electric/hybrid vehicles. The dock is used by the City of Chicago to charge its stock of cars.

Thornton Tomasetti was responsible for the structural design and detailing of steel and connections for Adrian Smith + Gordon Gill Architecture. The 11-foot tall structure has a steel superstructure and concrete foundation with a 300-SF canopy. Attached photovoltaic panels provide space for two cars. The unit can function singularly or linked with other canopies. +

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021