flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UMass Medical School’s new Education and Research Building

University Buildings

UMass Medical School’s new Education and Research Building

ZGF and ARC/Architectural Resources Cambridge are designing the project.


By David Malone, Associate Editor | May 4, 2021
UMass Education and Research building exterior

Renderings courtesy ZGF

The new Education and Research Building, a nine-story biomedical research building at the University of Massachusetts Medical School, will support the development of therapeutics for some of the world’s most challenging diseases in a high-performance, sustainable environment.

The 350,000-sf facility will include space for 77 principal investigators and house the Medical School’s Horae Gene Therapy Center, the Departments of Neurology and Neurobiology, the Program in Molecular Medicine, a new Program in Human Genetics & Evolutionary Biology, and an FDA-compliant manufacturing facility for clinical trial therapeutics.

 

UMass education and research building circulation and gathering space

 

The project is being designed to meet ambitious sustainability goals, including achieving Net Zero Energy and LEED Gold certification and the integration of a high-performance double-skin facade and geothermal heat pumps. The interior features natural daylighting and transparency, active circulation, and large social and interaction spaces.

The project is slated to open in the fall of 2023. Shawmut Design and Construction will be the project’s construction manager.

 

UMass Education and Research Building lab space

Related Stories

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Polshek Partnership unveils design for University of North Texas business building

New York-based architect Polshek Partnership today unveiled its design scheme for the $70 million Business Leadership Building at the University of North Texas in Denton. Designed to provide UNT’s 5,400-plus business majors the highest level of academic instruction and professional training, the 180,000-sf facility will include an open atrium, an internet café, and numerous study and tutoring rooms—all designed to help develop a spirit of collaboration and team-oriented focus.

| Aug 11, 2010

UCLA to get more graduate housing

The University of California, Los Angeles, has begun a new graduate housing project that will occupy 275,000 sf of the campus. The Wayburn Terrace Graduate Housing Project, led by California-based construction management and consulting firm Gafcon, includes a residential building comprising 500 studio apartments, a commons building, and administrative offices.

| Aug 11, 2010

Fashion school gives old building a make over

A new art facility for LIM, the College for the Business of Fashion, in midtown Manhattan is the result of a gut renovation of a six-story townhouse-school built in 1880. The new facility will continue LIM's mission of educating undergraduates on the business side of fashion. Architecture firm Butler Rogers Baskett transformed the old building's claustrophobic layout into a modern, multifunctio...

| Aug 11, 2010

Biomedical center to join London's research scene

The UK Centre for Medical Research and Innovation, a partnership of scientific organizations researching new treatments for illnesses such as cancer and heart disease, hopes to attract leading medical scientists to its planned research center. Designed by HOK London, the building will be located on 3.

| Aug 11, 2010

San Diego Mesa College enhances math and science facilities

A $92 million, 180,000-sf instructional center soon will rise at the heart of San Diego Mesa College in California. Slated to open in November 2012, the Math and Science Building will be funded by Propositions S and N construction bond program. The blueprint calls for four floors of classrooms, laboratory space, and offices for several science departments.

| Aug 11, 2010

Tufts University puts bite into new dental school addition

The recently dedicated Tufts University School of Dental Medicine, in Boston, represents the culmination of a 22-month vertical expansion of the school's original 1972 building. The $68 million project involved constructing five new stories totaling 95,000 sf atop the building's existing 10 stories, which were also remodeled.

| Aug 11, 2010

Northeast Lakeview College opens in Texas, to serve 15,000 students

After four years of construction, Northeast Lakeview College, the newest addition to Alamo Colleges, is complete. Designed by Overland Partners Architects in collaboration with Ford Powell & Carson, the nine-building, 285-acre campus in Universal City, near San Antonio, will serve up to 15,000 students.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021