flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Union Square’s first ground-up development in two decades completes

Mixed-Use

Union Square’s first ground-up development in two decades completes

MBH Architects, in collaboration with Page & Turnbull, designed the project.


By David Malone, Associate Editor | January 20, 2021
300 Grant

Photos courtesy of Matthew Anderson

300 Grant Avenue, a 70.000-sf mixed-use project, has been completed, making it the first new ground-up development in San Francisco’s Union Square in over 20 years. The project includes approximately 28,100 sf of retail and 41,500 sf of Class A office space.

The project sits within the historic Kearny/Market/Mason/Sutter Conservation district and is inspired and defined by classical proportions and modern detailing.

 

300 Grant in San Francisco's Union Square

 

The six-story building features three levels of boutique office spaces above three floors of high-street retail spaces. Interior spaces are flooded with abundant natural light thanks to floor-to-ceiling windows. Horizontal scrim with a terra cotta finish wraps the top four floors to provide a sense of privacy and sunlight diffusion. 

A formerly underutilized side alley was transformed into a publicly-accessible parklet, complete with permanent and temporary seating and a wind-generated public art component, to meld the public areas with the private tenant spaces.

Tags

Related Stories

Sponsored | | Mar 3, 2015

New York’s Fulton Center relies on TGP for light-flooded, underground transit hub

Fire-rated curtain wall systems filled this subterranean hub with natural light.

Sponsored | Shopping Centers | Feb 26, 2015

A color-changing gateway for Altara Center

Valspar works with developers to complete a multicolored shopping center façade in Honduras.

Industrial Facilities | Feb 24, 2015

Starchitecture meets agriculture: OMA unveils design for Kentucky community farming facility

The $460 million Food Port project will define a new model for the relationship between consumer and producer.

Office Buildings | Feb 18, 2015

Commercial real estate developers optimistic, but concerned about taxes, jobs outlook

The outlook for the commercial real estate industry remains strong despite growing concerns over sluggish job creation and higher taxes, according to a new survey of commercial real estate professionals by NAIOP.

Mixed-Use | Feb 13, 2015

First Look: Sacramento Planning Commission approves mixed-use tower by the new Kings arena

The project, named Downtown Plaza Tower, will have 16 stories and will include a public lobby, retail and office space, 250 hotel rooms, and residences at the top of the tower. 

Mixed-Use | Feb 11, 2015

Developer plans to turn Eero Saarinen's Bell Labs HQ into New Urbanist town center

Designed by Eero Saarinen in the late 1950s, the two-million-sf, steel-and-glass building was one of the best-funded and successful corporate research laboratories in the world.

Office Buildings | Jan 27, 2015

London plans to build Foggo Associates' 'can of ham' building

The much delayed high-rise development at London’s 60-70 St. Mary Axe resembles a can of ham, and the project's architects are embracing the playful sobriquet.

Mixed-Use | Jan 26, 2015

MVRDV designs twisty skyscraper to grace Vienna's skyline

The twist maximizes floor space and decreases the amount of shadows the building will cast on the surrounding area.

| Jan 7, 2015

4 audacious projects that could transform Houston

Converting the Astrodome to an urban farm and public park is one of the proposals on the table in Houston, according to news site Houston CultureMap.

| Oct 31, 2014

Dubai plans world’s next tallest towers

Emaar Properties has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021