Extreme sustainability was the chief goal for the reconstruction of Edward Durrell Stone’s Kellogg Center for Continuing Education at the University of Chicago.
Mortenson (CM) and Farr Associates (architect) put Stone’s New Formalism structure, built in 1963, on track to be the healthiest building in the Chicago area—the first LEED Platinum on the Maroons’ campus, and only the third project in the city to seek Petal certification (materials, equity, beauty) from the Living Building Challenge.
To meet the LBC’s “red list” requirements, all materials used by trade partners had to be vetted for banned chemicals. The carbon footprint of laborers and trade partners was tracked to reduce greenhouse gas emissions.
En route to achieving those standards, Mortenson and its CM partner, minority-owned contractor Ardmore Roderick, exceeded the university’s social hiring goals: 59% MWBE participation (vs. a goal of 30%) and an amazing 81% minority labor participation (vs. a 40% goal).
The wood for the Harris Family Forum was recycled from trees felled by the emerald ash borer. The Keller Center was originally built in 1963.
The CM team used Lean strategies (Last Planner, 5S) to streamline workflow and improve safety. The project had a total recordable incident rate of 0.71, compared to the industry standard of 3.20. MEP subcontractors were brought on early to provide design-assist expertise.
Farr Associates designed the 150,000 kWh/year rooftop PV system, which supplies 11% of the building’s energy, so that the 354 panels could be relocated in the event of future expansion of the Harris School of Public Policy.
The project team won a variance from the city to reduce the required size of the building’s green roof by installing a 15,000-gallon cistern, which stores rainwater for reuse in landscaping and toilet flushing, diverting 525,000 gallons of fresh water from the sewer system.
Three light courts were carved into the concrete structure to provide a balance of daylight between the borrowed light of perimeter windows across the deep floor plates.
SILVER AWARD WINNER
BUILDING TEAM Mortenson (submitting firm, CM) The University of Chicago (owner) Farr Associates (architect) Woodhouse Tinucci Architects (collaborating architect, interior designer) Stearn Joglekar, Ltd. (SE) dbHMS (MEP/FP) WJE (building forensics) Shen Milsom Wilke (acoustics/AV) WSP (LBC Red List consultant) site design group (landscape) Ardmore Roderick (CM partner) DETAILS 125,000 sf Total cost $60 million Construction time April 2017 to December 2018 Delivery method CM at risk
Related Stories
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.
Reconstruction Awards | Nov 27, 2017
Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds
Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.