flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

High-rise Construction

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.


By Mike Chamernik, Associate Editor | May 2, 2016
Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

Vista Tower. Renderings courtesy Studio Gang.

Construction will soon begin on Studio Gang’s 93-story Vista Tower in Chicago. 

Crain’s Chicago reports that the city made the official announcement Monday that ground will be broken this summer. 

At 1,186 feet, the supertall tower will be the third-tallest in the city, behind the Willis Tower (1,450 feet) and Trump International Hotel & Tower (1,389 feet). It will be just higher than the 1,136-foot Aon Center and the 1,127-foot John Hancock Center. Vista Tower is comprised of three interconnected volumes at 47, 71, and 93 stories.

Magellan Development and Dalian Wanda Group are leading the building process. The $1 billion development will include 200 hotel rooms and 400 condos. Located along the Chicago River, Vista Tower will connect to the Riverwalk, a public plaza along the water.

“At ground level, the building creates an essential pedestrian connection between the Riverwalk and the community park’s outdoor recreational facilities,” said the project description on Studio Gang’s website. “Retail, restaurant, and hotel amenities combine at the upper levels, creating a vibrant public social center—a microcosm of a city united.”

Gang’s tower is just one of several new projects for the city. Designers Rafael Viñoly and Helmut Jahn have also designed supertall structures for Chicago.

 

Click image to enlarge.

Click image to enlarge.

Click image to enlarge.

 

Update*

Vista Tower is half completed

The 101-story Vista Tower, which will become Chicago’s third tallest once completed, is now 50% complete. Concrete has been poured to the 50th floor with a year and a half until the slated move-in date.

The towers glass façade will reflect the blue-green hue of the neighboring Chicago River and Lake Michigan. Meanwhile, the interiors will give residents the option of choosing between four gem tone finishes: fluorite, amethyst, topaz, and sapphire.

The building’s units are currently more than 40% sold.

 

 

Related Stories

High-rise Construction | Dec 20, 2017

Another record year for high-rise construction

More than 140 skyscrapers were completed across the globe this year, including 15 supertall towers.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

High-rise Construction | Sep 8, 2017

CTBUH determines fastest elevators and longest runs in the world in new TBIN Study

When it comes to the tallest skyscrapers in the world, the vertical commute in the building becomes just as important as the horizontal commute through the city.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Mixed-Use | Aug 30, 2017

A 50-acre waterfront redevelopment gets under way in Tampa

Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.

Codes and Standards | Aug 7, 2017

Council on Tall Buildings and Urban Habitat to create standards to measure floor area

The standards will examine existing codes and regulations to find where they are too broad or contentious.

High-rise Construction | Aug 1, 2017

Construction on the world’s skinniest tower halts due to ballooning costs

The planned 82-story tower has stalled after completing just 20 stories.

Wood | Jun 13, 2017

The first timber high-rise in the U.S. set for construction in Portland

The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.

Office Buildings | May 30, 2017

How tech companies are rethinking the high-rise workplace

Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021