flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

*Updated* A Tulip is ready to bloom in London

High-rise Construction

*Updated* A Tulip is ready to bloom in London

Designed by Foster + Partners, the Tulip will rise 1,001 feet and be a new cultural and tourist attraction.


By David Malone, Associate Editor | April 10, 2019
The top of The Tulip in London

Rendering: DBOX for Foster + Partners

London already has an Eye, a Gherkin, and a Cheese Grater. Now, the City of London has approved plans for The Tulip.

Designed by Foster + Partners (designers of the Gherkin), the Tulip will rise 1,001 feet in the air and be a new cultural and tourist attraction meant to build public engagement within the City and enhance The Gherkin’s public offering.

Viewing galleries at the top of the Tulip will include sky bridges, internal glass slides, and gondola pod rides (think the gyrospheres from the Jurassic World movies) on the building’s façade. Interactive materials and expert guides will enhance the experience for visitors and provide information about the history of London.

See Also: SOM-designed 100 Leadenhall Street will be one of the tallest buildings in the U.K.

A sky bar and restaurants with 360-degree views will give visitors a place to eat and drink high above the city. Another key feature at the top of the Tulip will be an education facility that offers 20,000 free places per year for London’s state school children.

At the ground level, there will be a pocket park alongside a two-story pavilion with a publicly accessible rooftop garden. Half of the perimeter walls around the already completed Gherkin will be removed to improve public access to the revamped site.

Construction is expected to begin in 2020 with completion in 2025.

 

Update

It seems as though the tulip will not bloom after all. According to the BBC.com, London's Mayor, Sadiq Khan, has rejected plans for the new tower. According to the BBC, the reasons behind the rejection were as follows:

– The design did not constitute the very highest quality of design required for a building in the location

– The proximity, height and material would have a negative impact on the Tower of London World Heritage site

– The space around the proposed building was insufficient to be safe and to prevent overcrowding

– A lack of new cycle parking spaces failed to comply with the London Plan for transport

The Foster + Partners team described themselves as "disappointed" by the Mayor's decision and will "take time to consider potential next steps for The Tulip Project."

 

 

The Tulip next to The GherkinDBOX for Foster + Partners

The Tulip GondolasDBOX for Foster + Partners

Aerial view of The TulipDBOX for Foster + Partners

Inside the Tulip viewing deckDBOX for Foster + Partners

Inside the top of The TulipDBOX for Foster + Partners

Related Stories

Reconstruction & Renovation | Feb 2, 2017

$500 million investment will modernize Chicago’s Willis Tower *Updated*

The project will be the first major renovation in the building’s 43-year history.

High-rise Construction | Feb 1, 2017

Rippled tower from CORE will be first of 10-tower master plan in Mississauga, Ont.

The tower will become the tallest building in what is Canada’s 6th largest city.

High-rise Construction | Jan 31, 2017

Chicago’s West Loop to receive 500-foot apartment tower

The 44-story tower will provide 492 rental units and a retail podium.

High-rise Construction | Jan 27, 2017

Silverstein Properties waffles on what to do with Far West Side property

The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Architects | Jan 24, 2017

Politicians use architectural renderings in bid to sell Chicago’s Thompson Center

The renderings are meant to show the potential of the site located in the heart of the Chicago Loop.

High-rise Construction | Jan 23, 2017

Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016

This marks the third consecutive record-breaking year for building completions over 200 meters.

High-rise Construction | Jan 20, 2017

CTBUH’s tall building predictions for 2017

Woodscrapers, the automobile industry's expansion into the tall building development business, and Nairobi's climb toward becoming Africa's skyscraper hub are just a few of the topics CTBUH's 2017 tall building predictions report focuses on.

High-rise Construction | Jan 19, 2017

Goettsch Partners to design Shenzhen-based headquarters complex

The Chicago architecture firm won a design competition for the project anticipated to be completed in 2019.

High-rise Construction | Jan 6, 2017

76-Story luxury apartment tower in Chicago’s South Loop gets name and begins construction

The building was designed by Rafael Viñoly and is scheduled for completion in 2019.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021