flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

*Updated* A Tulip is ready to bloom in London

High-rise Construction

*Updated* A Tulip is ready to bloom in London

Designed by Foster + Partners, the Tulip will rise 1,001 feet and be a new cultural and tourist attraction.


By David Malone, Associate Editor | April 10, 2019
The top of The Tulip in London

Rendering: DBOX for Foster + Partners

London already has an Eye, a Gherkin, and a Cheese Grater. Now, the City of London has approved plans for The Tulip.

Designed by Foster + Partners (designers of the Gherkin), the Tulip will rise 1,001 feet in the air and be a new cultural and tourist attraction meant to build public engagement within the City and enhance The Gherkin’s public offering.

Viewing galleries at the top of the Tulip will include sky bridges, internal glass slides, and gondola pod rides (think the gyrospheres from the Jurassic World movies) on the building’s façade. Interactive materials and expert guides will enhance the experience for visitors and provide information about the history of London.

See Also: SOM-designed 100 Leadenhall Street will be one of the tallest buildings in the U.K.

A sky bar and restaurants with 360-degree views will give visitors a place to eat and drink high above the city. Another key feature at the top of the Tulip will be an education facility that offers 20,000 free places per year for London’s state school children.

At the ground level, there will be a pocket park alongside a two-story pavilion with a publicly accessible rooftop garden. Half of the perimeter walls around the already completed Gherkin will be removed to improve public access to the revamped site.

Construction is expected to begin in 2020 with completion in 2025.

 

Update

It seems as though the tulip will not bloom after all. According to the BBC.com, London's Mayor, Sadiq Khan, has rejected plans for the new tower. According to the BBC, the reasons behind the rejection were as follows:

– The design did not constitute the very highest quality of design required for a building in the location

– The proximity, height and material would have a negative impact on the Tower of London World Heritage site

– The space around the proposed building was insufficient to be safe and to prevent overcrowding

– A lack of new cycle parking spaces failed to comply with the London Plan for transport

The Foster + Partners team described themselves as "disappointed" by the Mayor's decision and will "take time to consider potential next steps for The Tulip Project."

 

 

The Tulip next to The GherkinDBOX for Foster + Partners

The Tulip GondolasDBOX for Foster + Partners

Aerial view of The TulipDBOX for Foster + Partners

Inside the Tulip viewing deckDBOX for Foster + Partners

Inside the top of The TulipDBOX for Foster + Partners

Related Stories

High-rise Construction | Jun 28, 2016

CTBUH names winners and finalists for 2016 Tall Building Awards

Eight winners were named in five categories that recognized tall buildings, urban habitats, innovation, performance, and decade-long excellence.

High-rise Construction | Jun 15, 2016

WilkinsonEyre designs diamond-patterned Bay Park Centre for Toronto

A sloping plaza with trees, grass, and gardens connects the two downtown towers.

Sponsored | High-rise Construction | Jun 13, 2016

Marilyn Monroe’ tower adds curves to the Toronto skyline

Made of glass, concrete, and steel, the 56-story tower has been dubbed the "Marilyn Monroe" because of its curving lines.

High-rise Construction | Jun 7, 2016

Gensler’s Gateway Tower picks up where Calatrava's Chicago Spire left off

A new 2,000-foot tower has been proposed for a site that is currently a non-monument to an abandoned plan.

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

Building Team Awards | May 20, 2016

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.

High-rise Construction | May 17, 2016

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

One of Oceanwide Center’s buildings will be the city’s second tallest. 

Green | May 16, 2016

Development team picked for largest Passive House project in North America

The 24-story curved building would be 70% more efficient than comparable housing in New York City.

High-rise Construction | May 2, 2016

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.  

Wood | Apr 29, 2016

Anders Berensson Architects designs 40-story wooden skyscraper for Stockholm

The structure, which will be made entirely out of cross-laminated timber, will rise 436 feet into the air, making it Stockholm’s tallest building.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021