A Building Team led by R&A Architecture + Design has broken ground on The Camps at Coos Bay Lagoon, an RV camp and cabins park encompassing 103 acres along Camp Arago Highway in the Barview area of coastal Coos Bay, Ore.
The project—which was designed in collaboration with its client NBP Capital, a commercial real estate fund—is scheduled for completion next April.
The property on which the camp is being built had been a lumberyard and mill that were decommissioned in the 1970s. Remnants of a pier from that mill could be rebuilt in phase two of this project.
Because this land wasn’t suitable for traditional building foundations, the Building Team proposed instead a series of smaller structures for the campsite. Overlooking more than a mile of private beachfront, 180 campsites, modeled on an archipelago, will be organized in a way the harkens back to the Bay’s riparian past of marsh islands separated by numerous streams.
The Camp will be built on coastal property that once was used for a lumberyard and mill. Image: RA Architecture + Design
The campsite will include a new, V-shaped wood-and-glass clubhouse that can be used year-round. It will offer an indoor swimming pool, recreation rooms, meeting and entertainment spaces. The clubhouse will also feature outdoor terraces and decks.
Walking trails that lead to water and beachfront activities will connect the campsites. What had been parking areas have been converted to private camping areas with landscaped greenspaces for outdoor play and games. The campsites are also relatively close to Charleston marina.
The Building Team on this project includes McSwain & Woods Architects (associate architect), Nishkian Dean Structural Engineers (SE), Pacific Community Design (CE), and Strata Design (soils engineer).
“We worked diligently to preserve the natural beauty of the site,” says Christian Robert, AIA, NCARB, LEED AP, a co-founding principal at RA. “We were able to design a project that is respectful of its surroundings while remaining beneficial to the client.”
The Camps at Coos Bay Lagoon was the Popular Choice winner of Architizer’s 2017 A+Awards in the Unbuilt Hospitality category. RA, which launched in 2013, has several other small- and large-scale hospitality projects in development in West Hollywood and Napa Valley, Calif., Utah, and China.
Related Stories
| May 24, 2018
Accelerate Live! talk: Security and the built environment: Insights from an embassy designer
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.
Building Team Awards | May 16, 2018
Game, set, match: United States Tennis Association National Campus
Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.
Sports and Recreational Facilities | May 15, 2018
Is this the most environmentally sustainable arena in the country?
The university arena was designed by Architectural Resources Cambridge.
Sports and Recreational Facilities | Apr 19, 2018
Watch a time-lapse of Wrigley Field’s most recent phase of renovations
The renovations took place between October 2017 and April 2018.
Sports and Recreational Facilities | Apr 19, 2018
Northwestern’s new multi-sport training facility offers expansive views of Lake Michigan
Perkins+Will designed the facility.
Sports and Recreational Facilities | Apr 3, 2018
Westminster College’s new athletic stadium includes a turf field and seating for 2,000
The project is the largest capital improvement project on the campus in over a decade.
Sports and Recreational Facilities | Mar 30, 2018
Final Four excitement? Here are two collegiate sports facilities to check out before your weekend of hoops
CannonDesign recently shared new images of two collegiate sports projects with interesting ties to college basketball past, present and future.
Sports and Recreational Facilities | Mar 27, 2018
The second-oldest basketball arena in NCAA Division I receives $15.5 million update
Bruner/Cott & Associates led the revitalization project.
Sports and Recreational Facilities | Feb 23, 2018
A gym’s exercise equipment helps power an arts and sciences center in Rochester, N.Y.
The equipment’s supplier is eyeing the U.S. for aggressive growth.
Reconstruction & Renovation | Feb 1, 2018
USC selects Hathaway Dinwiddie and AECOM to mange L.A. Memorial Coliseum renovations
The iconic stadium opened in 1923.