A Building Team led by R&A Architecture + Design has broken ground on The Camps at Coos Bay Lagoon, an RV camp and cabins park encompassing 103 acres along Camp Arago Highway in the Barview area of coastal Coos Bay, Ore.
The project—which was designed in collaboration with its client NBP Capital, a commercial real estate fund—is scheduled for completion next April.
The property on which the camp is being built had been a lumberyard and mill that were decommissioned in the 1970s. Remnants of a pier from that mill could be rebuilt in phase two of this project.
Because this land wasn’t suitable for traditional building foundations, the Building Team proposed instead a series of smaller structures for the campsite. Overlooking more than a mile of private beachfront, 180 campsites, modeled on an archipelago, will be organized in a way the harkens back to the Bay’s riparian past of marsh islands separated by numerous streams.
The Camp will be built on coastal property that once was used for a lumberyard and mill. Image: RA Architecture + Design
The campsite will include a new, V-shaped wood-and-glass clubhouse that can be used year-round. It will offer an indoor swimming pool, recreation rooms, meeting and entertainment spaces. The clubhouse will also feature outdoor terraces and decks.
Walking trails that lead to water and beachfront activities will connect the campsites. What had been parking areas have been converted to private camping areas with landscaped greenspaces for outdoor play and games. The campsites are also relatively close to Charleston marina.
The Building Team on this project includes McSwain & Woods Architects (associate architect), Nishkian Dean Structural Engineers (SE), Pacific Community Design (CE), and Strata Design (soils engineer).
“We worked diligently to preserve the natural beauty of the site,” says Christian Robert, AIA, NCARB, LEED AP, a co-founding principal at RA. “We were able to design a project that is respectful of its surroundings while remaining beneficial to the client.”
The Camps at Coos Bay Lagoon was the Popular Choice winner of Architizer’s 2017 A+Awards in the Unbuilt Hospitality category. RA, which launched in 2013, has several other small- and large-scale hospitality projects in development in West Hollywood and Napa Valley, Calif., Utah, and China.
Related Stories
Sports and Recreational Facilities | Sep 27, 2017
A soccer team’s fan base could play an integral role in its new stadium’s design and operations
Sacramento Republic FC and HNTB are conducting a contest where the public can submit concept ideas.
Sports and Recreational Facilities | Sep 11, 2017
Mid-size, multi-use arenas setting a trend for the future
While large 20,000-seat sports venues aren’t going away, mid-size venues provide advantages the big arenas do not in a time of budget constraints and the need for flexibility.
AEC Tech | Aug 25, 2017
Software cornucopia: Jacksonville Jaguars’ new practice facility showcases the power of computational design
The project team employed Revit, Rhino, Grasshopper, Kangaroo, and a host of other software applications to design and build this uber-complex sports and entertainment facility.
Sports and Recreational Facilities | Aug 18, 2017
Video: Designing the ideal rugby stadium
HOK invited four world-class rugby players into its London studio to discuss what they would like to see in the rugby stadiums of the future.
Sports and Recreational Facilities | Aug 16, 2017
Detroit Pistons Performance Center hopes to invigorate the community, create an NBA championship team
The facility will be incorporated into the community with public spaces.
Sports and Recreational Facilities | Jul 17, 2017
A new Rec Centre in Toronto links three neighborhoods
Community engagement impacts its design and programming.
Codes and Standards | Jun 21, 2017
Senate bill would prohibit tax money for sports stadium projects
Bipartisan legislation would prevent use of municipal bonds by pro teams.
Building Team Awards | Jun 8, 2017
Team win: Clemson University Allen N. Reeves Football Operations Complex
Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.
Sports and Recreational Facilities | May 19, 2017
Construction of $2.6 billion L.A. football stadium delayed by heavy rains
The Rams and Chargers won’t be able to move in until the 2020 season.
Sports and Recreational Facilities | Apr 21, 2017
3D printed models bring new economic district in Detroit to life
The centerpiece is the scaled replica of a new arena that puts a miniature fan in every seat.