flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The U.S. construction pipeline remains robust through the first half of 2020, despite pandemic

Market Data

The U.S. construction pipeline remains robust through the first half of 2020, despite pandemic

Projects currently under construction stand at 1,771 projects/235,467 rooms, up 3% and 1% respectively, YOY.


By Lodging Econometrics | July 27, 2020

Courtesy Pixabay

Analysts at Lodging Econometrics (LE) report that at the close of the second quarter of 2020, the total U.S. hotel construction pipeline stands at 5,582 projects/687,801 rooms, down a mere 1% by projects and rooms, Year-Over-Year (YOY). Remarkably, despite some project cancelations, postponements, and delays, there has been minimal impact on the U.S. construction pipeline. Contrary to what is being experienced with hotel operations, the pipeline remains robust as interest rates are at all-time lows. 

Projects currently under construction stand at 1,771 projects/235,467 rooms, up 3% and 1% respectively, YOY. Projects scheduled to start construction in the next 12 months total 2,389 projects/276,247 rooms. Projects in the early planning stage stand at 1,422 projects/176,087 rooms. As expected, developers with projects under construction are still experiencing some opening delays. However, projects continue to move forward, albeit with extended timelines. As was the case at the end of the first quarter, developers with projects scheduled to start construction in the next 12 months continue to monitor current events and make adjustments to their construction start and opening dates. 

In the first half of 2020, the U.S. opened 313 new hotels with 36,992 rooms. Additionally, there were 481 new projects with 56,823 rooms announced into the pipeline in the first half of 2020. Of those totals, 169 new project announcements with 20,359 rooms occurred in the second quarter. With franchise development staff largely working from home, non-essential travel halted, and with the on-going pandemic, the ability to get a new development deal signed has slowed. This has resulted in a 53% decrease in new project announcements compared to the second quarter of 2019 when 359 projects/44,895 rooms were recorded. 

With the arrival of summer, the country has begun to see an uptick in domestic leisure travel. As a result, more and more hotels are re-opening, and many others have begun to move-up renovation plans and/or are repositioning their property with a brand conversion. In the first half of 2020, LE recorded 1,465 active renovation projects/314,043 rooms and 1,196 active conversion projects/136,110 rooms throughout the United States.

Related Stories

Market Data | Apr 9, 2020

7 must reads for the AEC industry today: April 9, 2020

Urine could be the key to building in outer space and how to turn a high school into a patient care center in just over two weeks.

Market Data | Apr 8, 2020

6 must reads for the AEC industry today: April 8, 2020

Stantec discusses how hospitals can adapt buildings to address worst-case scenarios and FXCollaborative Architects tells us why cities will survive the pandemic.

Market Data | Apr 7, 2020

7 must reads for the AEC industry today: April 7, 2020

Leo A Daly's Hotel2Hospital prototype takes shape, while the number of delayed projects reaches 2,550 in the U.S. amid coronavirus pandemic.

Market Data | Apr 3, 2020

COVID-19 cuts nonresidential construction employment in March

The construction unemployment rate was 6.9% in March, up 1.7 percentage points from the same time one year ago.

Market Data | Apr 1, 2020

February’s construction spending decline indicates what’s to come

Private nonresidential spending declined 2% on a monthly basis and is down 0.7% compared to February 2019.

Market Data | Mar 26, 2020

Architects taking action to support COVID-19 response

New AIA task force will offer insights for adapting buildings into healthcare facilities.

Market Data | Mar 26, 2020

Senate coronavirus relief bill's tax and lending provisions will help construction firms, but industry needs additional measures

Construction officials say measure will help firms cope with immediate cash flow crunch, but industry needs compensation for losses.

Market Data | Mar 25, 2020

Engineering and construction materials prices fall for first time in 40 months on coronavirus impacts, IHS Markit says

Survey respondents reported falling prices for five out of the 12 components within the materials and equipment sub-index.

Market Data | Mar 23, 2020

Coronavirus will reshape UAE construction

The impact of the virus has been felt in the UAE, where precautionary measures have been implemented to combat the spread of the virus through social distancing.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021