Hoffman & Associates has recently announced the groundbreaking of Waterfront Station II, a mixed-use development located in the heart of Southwest D.C. The project is less than one block from the Waterfront Station green line metro stop and three blocks from The Wharf neighborhood.
Upon completion, the 12-story, 400,000-sf building will include a mix of market-rate and affordable residences and retailers including a performing arts theater space, AppleTree Public Charter School, and a neighborhood restaurant by Good Company Doughnuts. Modern design elements will include angular glass balconies that mirror the waves of the nearby waterfront and contemporary interior finishes.
The project’s residential component includes 449 apartment units ranging from studios to two-bedrooms. Thirty percent of the units (136) will be designated affordable housing units. Of those 136 units, 68 will be available to households earning at 30% of the area median income and 68 for households earning at 50% of the area median income.
Waterfront Station II will feature more than 19,000 sf of outdoor and interior amenity space. The property will offer 13 distinct amenity areas across four floors of the building. Amenities will include a 2,200-sf coworking and communal gathering space, a 3,000-sf fitness center, entertainment and hospitality lounges, and a library. Outdoor amenities include a second-floor courtyard and a rooftop terrace and pool.
Waterfront Station II is anticipated to complete in winter 2023.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.