flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show: Curtis Fentress, FAIA, on airport design, and how P3s are keeping university projects alive

Airports

The Weekly show: Curtis Fentress, FAIA, on airport design, and how P3s are keeping university projects alive

The September 10 episode of BD+C's "The Weekly" is available for viewing on demand.


By BD+C STAFF | September 10, 2020
The Weekly show: Curtis Fentress, FAIA, on airport design, and how P3s are keeping university projects alive
The Weekly show: Curtis Fentress, FAIA, on airport design, and how P3s are keeping university projects alive

This week on The Weekly, BD+C editors spoke with leaders from Fentress Architects, Interface Studio, Ninigret Partners, and Rockford Construction on three timely topics:     
• The state of airport terminal design amid COVID-19
• How P3s are keeping university projects alive
• Retail planning after the pandemic

 

WATCH THE SEGMENTS ON DEMAND BELOW 

 

THE WEEKLY SHOW HIGHLIGHTS FOR SEPTEMBER 10, 2020

 

 

SEGMENT #1 - The state of airport terminal design amid COVID-19

Curtis Fentress, FAIA, RIBA, Principal in Charge of Design with Fentress Architects, talks about the current and future state of air travel and airport terminal design amid COVID-19. Will we see a bounce back in airport construction? How will terminals be designed and operated differently post-COVID-19? What are some of the top design innovations to combat pandemic concerns and enhance infection control? Fentress and BD+C's David Barista discuss these topics and more.

 

 

SEGMENT #2 - How P3s are keeping university projects alive

BD+C's John Caulfield interviews Mellissa Collar, Vice President of Strategic Partnerships with Rockford Construction in Grand Rapids, Mich., about the advantages and benefits of using public-private partnerships (P3s) to fund projects and keep them moving forward. Collar points out that P3s aren't confined to major construction or infrastructure projects. They have become particularly useful to cash-strapped universities. P3s can resolve clients' capital and risk issues, and can also help keep projects on time and budget because all of the investment and building parties are working together early in the project.

 

 

SEGMENT #3 - Getting to districtwide retail planning after the pandemic

Scott Page and Sarah Kellerman of Interface Studio and Kevin Hively of Ninigret Partners discuss ways to "Restart. Reset. Retool. Refit" (download Interface Studio's report). urban retail districts and neighborhood strip malls by going beyond so-called best practices in urban planning and economics. To revitalize retail after the COVID-19 pandemic, we have to plan beyond individual buildings and think about whole shopping districts, according to the trio of experts. They speak with BD+C's Robert Cassidy about how to get to districtwide retail planning after the pandemic.

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

Airports | Sep 11, 2017

Terminal modernization: Why bother? Part I

A terminal modernization program can be a complicated and expensive task that airport operators may be hesitant to undertake unless necessitated by demands for increased capacity. This is the first post in our series examining why airport operators should bother to upgrade their facilities, even if capacity isn’t forcing the issue.   

Hotel Facilities | Jul 5, 2017

It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension

PPVC techniques allowed the project to save time and manpower.

Airports | Jun 26, 2017

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

The project includes a new 1 million-sf terminal building with 33 domestic aircraft gates.

Building Team Awards | Jun 8, 2017

Missing link: Denver International Airport and Transit Center

Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.

Airports | May 15, 2017

Five trends for airport retail

CallisonRTKL Vice President Kevin Horn pinpoints how travel retail is changing dramatically.

Reconstruction & Renovation | Mar 16, 2017

Pols are ready to spend $1T on rebuilding America’s infrastructure. But who will pick which projects benefit?

The accounting and consulting firm PwC offers the industrial sector a five-step approach to getting more involved in this process.

Airports | Feb 23, 2017

New Orleans Airport to add five additional gates and $110 million to current expansion

The project is being hailed as the city’s most transformative since the construction of the Superdome.

Projects | Jan 25, 2017

Trump prioritizes infrastructure projects, as rebuilding America is now a hot political potato

Both parties are talking about $1 trillion in spending over the next decade. How projects will be funded, though, remains unresolved.

Airports | Jan 17, 2017

JFK Airport set for $10 billion renovation

In addition to the airport itself, the overhaul will also improve road and rail access to meet projected passenger growth.

Airports | Dec 6, 2016

Phoenix Sky Harbor International Airport creates a destination inside Terminal 3

DWL Architects, SmithGroupJJR, and Corgan design passenger experience that connects to the surrounding city and Sonoran desert landscape.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021