flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

AEC Tech

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.


By BD+C Editors | November 12, 2020
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

This week on The Weekly show, BD+C editors spoke with leaders from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot about three themes: 
• How to improve wayfinding and signage to meet the needs of a pandemic environment  
• Applications for the use of artificial intelligence (AI) in construction scheduling 
• Omniverse, Nvidia's new 3D simulation platform 
 

 

WATCH THE SEGMENTS ON DEMAND BELOW

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR NOVEMBER 12, 2020

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

SEGMENT #1

COVID-19 Signage Design and Wayfinding 
BD+C's Robert Cassidy chats with David Bailey, AIA, Principal with Hastings Architecture, Nashville, Tenn., about improved signage and wayfinding for the COVID-19 pandemic. Bailey will show examples of bad signage that has sprung up, and how Hastings Architecture has designed new signs that use graphics and text to provide better information and clearer direction to the public.

 

 

SEGMENT #2

AI for Construction Scheduling
BD+C's David Barista speaks with Rene Morkos, PhD, Founder of ALICE Technologies, and Mike MacBean, Director of Preconstruction with San Francisco-based GC Build Group, about applications for the use of artificial intelligence (AI) tools for optimizing the construction scheduling process. Build Group is piloting the ALICE platform on the 5M mega project in San Francisco.

 

 

SEGMENT #3

Omniverse: A Collaborative Platform to Simulate Reality
John Caulfield speaks with Richard Kerris, GM of Media and Entertainment for Nvidia, and Robert Cervellione, Design Technology Manager with Woods Bagot, about Omniverse, Nvidia's 3D simulation platform that allows users to collaborate with multiple pieces of software. 

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

Transportation & Parking Facilities | Aug 23, 2023

California parking garage features wind-activated moving mural

A massive, colorful, moving mural creatively conceals a newly opened parking garage for a global technology company in Mountain View, Calif.

Digital Twin | Jul 31, 2023

Creating the foundation for a Digital Twin

Aligning the BIM model with the owner’s asset management system is the crucial first step in creating a Digital Twin. By following these guidelines, organizations can harness the power of Digital Twins to optimize facility management, maintenance planning, and decision-making throughout the building’s lifecycle.

Designers | Jul 25, 2023

The latest 'five in focus' healthcare interior design trends

HMC Architects’ Five in Focus blog series explores the latest trends, ideas, and innovations shaping the future of healthcare design.

Digital Twin | Jul 17, 2023

Unlocking the power of digital twins: Maximizing success with OKRs

To effectively capitalize on digital twin technology, owners can align their efforts using objectives and key results (OKRs).

Standards | Jun 26, 2023

New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings

The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.

Virtual Reality | Jun 16, 2023

Can a VR-enabled AEC Firm transform building projects?

With the aid of virtual reality and 3D visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

AEC Innovators | Jun 15, 2023

Rogers-O'Brien Construction pilots wearables to reduce heat-related injuries on jobsites

Rogers-O'Brien Construction (RO) has launched a pilot program utilizing SafeGuard, a safety-as-a-service platform for real-time health and safety risk assessment. Non-invasive wearables connected to SafeGuard continuously monitor personnel to prevent heat exhaustion on jobsites, reducing the risk of related injuries. RO is the first general contractor to pilot this program.

Contractors | May 26, 2023

Enhanced use of data is crucial for improving construction job site safety

Executives with major construction companies say new digital tools are allowing them to use data more effectively to reduce serious safety incidents and improve job site safety.

AEC Tech Innovation | May 12, 2023

Meet Diverge, Hensel Phelps' new ConTech investment company

Thai Nguyen, Director of Innovation with Hensel Phelps, discusses the construction giant's new startup investment platform, Diverge.

AEC Tech | May 9, 2023

4 insights on building product manufacturers getting ‘smart’

Overall, half of building product manufacturers plan to invest in one or more areas of technology in the next three years.

boombox1
boombox2
native1

More In Category


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021