flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

AEC Tech

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.


By BD+C Editors | November 12, 2020
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

This week on The Weekly show, BD+C editors spoke with leaders from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot about three themes: 
• How to improve wayfinding and signage to meet the needs of a pandemic environment  
• Applications for the use of artificial intelligence (AI) in construction scheduling 
• Omniverse, Nvidia's new 3D simulation platform 
 

 

WATCH THE SEGMENTS ON DEMAND BELOW

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR NOVEMBER 12, 2020

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

SEGMENT #1

COVID-19 Signage Design and Wayfinding 
BD+C's Robert Cassidy chats with David Bailey, AIA, Principal with Hastings Architecture, Nashville, Tenn., about improved signage and wayfinding for the COVID-19 pandemic. Bailey will show examples of bad signage that has sprung up, and how Hastings Architecture has designed new signs that use graphics and text to provide better information and clearer direction to the public.

 

 

SEGMENT #2

AI for Construction Scheduling
BD+C's David Barista speaks with Rene Morkos, PhD, Founder of ALICE Technologies, and Mike MacBean, Director of Preconstruction with San Francisco-based GC Build Group, about applications for the use of artificial intelligence (AI) tools for optimizing the construction scheduling process. Build Group is piloting the ALICE platform on the 5M mega project in San Francisco.

 

 

SEGMENT #3

Omniverse: A Collaborative Platform to Simulate Reality
John Caulfield speaks with Richard Kerris, GM of Media and Entertainment for Nvidia, and Robert Cervellione, Design Technology Manager with Woods Bagot, about Omniverse, Nvidia's 3D simulation platform that allows users to collaborate with multiple pieces of software. 

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

AEC Tech | Mar 10, 2016

Is the Internet of Things the key to smarter buildings and cities?

Experts say yes. But what’s needed is a point person who makes sure that sensing devices can “talk” to each other.

Multifamily Housing | Mar 10, 2016

Access and energy control app clicks with student housing developers and managers

Ease of installation is one of StratIS’s selling features.

AEC Tech | Mar 8, 2016

WiredScore offers developers competitive advantage in marketing

Designates best-in-class Internet connectivity.  

Game Changers | Feb 5, 2016

London’s ’shadowless’ towers

Using advanced design computation, a design team demonstrates how to ‘erase’ a building’s shadows.

Game Changers | Feb 5, 2016

Asia’s modular miracle

A prefab construction company in China built a 57-story tower in 19 days. Here’s how they did it.  

Game Changers | Feb 5, 2016

Tesla: Battery storage is not just about electric vehicles

With his $5 billion, 13.6 million-sf Gigafactory, Tesla’s Elon Musk seeks to change the economics of battery energy storage, forever. 

BIM and Information Technology | Jan 27, 2016

Seeing double: Dassault Systèmes creating Virtual Singapore that mirrors the real world

The virtual city will be used to help predict the outcomes of and possible issues with various scenarios.

3D Printing | Jan 25, 2016

Architecture students create new method for 3D printing concrete

The team's Fossilized project allows for structures that are more varied and volumetric than other forms so far achieved.

boombox1
boombox2
native1

More In Category


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021