flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

AEC Tech

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.


By BD+C Editors | November 12, 2020
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

This week on The Weekly show, BD+C editors spoke with leaders from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot about three themes: 
• How to improve wayfinding and signage to meet the needs of a pandemic environment  
• Applications for the use of artificial intelligence (AI) in construction scheduling 
• Omniverse, Nvidia's new 3D simulation platform 
 

 

WATCH THE SEGMENTS ON DEMAND BELOW

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR NOVEMBER 12, 2020

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

SEGMENT #1

COVID-19 Signage Design and Wayfinding 
BD+C's Robert Cassidy chats with David Bailey, AIA, Principal with Hastings Architecture, Nashville, Tenn., about improved signage and wayfinding for the COVID-19 pandemic. Bailey will show examples of bad signage that has sprung up, and how Hastings Architecture has designed new signs that use graphics and text to provide better information and clearer direction to the public.

 

 

SEGMENT #2

AI for Construction Scheduling
BD+C's David Barista speaks with Rene Morkos, PhD, Founder of ALICE Technologies, and Mike MacBean, Director of Preconstruction with San Francisco-based GC Build Group, about applications for the use of artificial intelligence (AI) tools for optimizing the construction scheduling process. Build Group is piloting the ALICE platform on the 5M mega project in San Francisco.

 

 

SEGMENT #3

Omniverse: A Collaborative Platform to Simulate Reality
John Caulfield speaks with Richard Kerris, GM of Media and Entertainment for Nvidia, and Robert Cervellione, Design Technology Manager with Woods Bagot, about Omniverse, Nvidia's 3D simulation platform that allows users to collaborate with multiple pieces of software. 

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

Big Data | May 5, 2016

Demand for data integration technologies for buildings is expected to soar over the next decade

A Navigant Research report takes a deeper dive to examine where demand will be strongest by region and building type. 

BIM and Information Technology | May 2, 2016

How HDR used computational design tools to create Omaha's UNO Baxter Arena

Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.

Virtual Reality | Apr 29, 2016

NBBJ to develop virtual reality productivity platform

The Seattle design firm has partnered with Visual Vocal, a startup VR company.

Drones | Apr 25, 2016

The Tremco SkyBEAM UAV is the first to be approved by the FAA for nighttime commercial operation

The SkyBEAM UAV is used for identifying energy leaks, rooftop damage, deteriorating façades, and safety issues without requiring scaffolding or cranes.

AEC Tech | Apr 15, 2016

Should architects learn to code?

Even if learning to code does not personally interest you, the growing demand for having these capabilities in an architectural business cannot be overlooked, writes computational design expert Nathan Miller.

Building Tech | Apr 12, 2016

Should we be worried about a tech slowdown?

Is the U.S. in an innovative funk, or is this just the calm before the storm?

AEC Tech | Apr 12, 2016

Startup introduces PaperLight, an interactive projection screen for AEC pros

The device lets users edit sketches, plans, and images with a stylus or their fingers.  

AEC Tech | Mar 31, 2016

Deep Learning + AI: How machines are becoming master problem solvers

Besides revolutionary changes to the world’s workforce, artificial intelligence could have a profound impact on the built environment and the AEC industry.

AEC Tech | Mar 17, 2016

Managing risks with laser scanning gives AEC firms an edge

The more that clients demand the service, the easier it is to justify the cost of laser scanning equipment and software.

AEC Tech | Mar 15, 2016

Two to tango: Project Tango isn’t just for entertainment, it also has a wide range of possibilities relating to the professional world

Making things like augmented reality, precise measurements of indoor spaces, and indoor wayfinding possible, Google’s Project Tango has all the makings to become a useful and ubiquitous tool in the AEC market.

boombox1
boombox2
native1

More In Category


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021