flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

AEC Tech

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.


By BD+C Editors | November 12, 2020
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

This week on The Weekly show, BD+C editors spoke with leaders from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot about three themes: 
• How to improve wayfinding and signage to meet the needs of a pandemic environment  
• Applications for the use of artificial intelligence (AI) in construction scheduling 
• Omniverse, Nvidia's new 3D simulation platform 
 

 

WATCH THE SEGMENTS ON DEMAND BELOW

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR NOVEMBER 12, 2020

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

SEGMENT #1

COVID-19 Signage Design and Wayfinding 
BD+C's Robert Cassidy chats with David Bailey, AIA, Principal with Hastings Architecture, Nashville, Tenn., about improved signage and wayfinding for the COVID-19 pandemic. Bailey will show examples of bad signage that has sprung up, and how Hastings Architecture has designed new signs that use graphics and text to provide better information and clearer direction to the public.

 

 

SEGMENT #2

AI for Construction Scheduling
BD+C's David Barista speaks with Rene Morkos, PhD, Founder of ALICE Technologies, and Mike MacBean, Director of Preconstruction with San Francisco-based GC Build Group, about applications for the use of artificial intelligence (AI) tools for optimizing the construction scheduling process. Build Group is piloting the ALICE platform on the 5M mega project in San Francisco.

 

 

SEGMENT #3

Omniverse: A Collaborative Platform to Simulate Reality
John Caulfield speaks with Richard Kerris, GM of Media and Entertainment for Nvidia, and Robert Cervellione, Design Technology Manager with Woods Bagot, about Omniverse, Nvidia's 3D simulation platform that allows users to collaborate with multiple pieces of software. 

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

| Jun 13, 2017

Accelerate Live! talk: Gaming tech in construction, Lucas Richmond, Gilbane

Learn why Gilbane’s Lucas Richmond is looking outside the AEC industry to build his rockstar gaming and media team.

| Jun 12, 2017

Accelerate Live! talk: The world's smartest buildings, Derik Eckhardt, Miller Hull Partnership

Discover what architect Derik Eckhardt learned during his worldwide tour of the globe’s smartest buildings, from Abu Dhabi to Amsterdam to Stuttgart to Dubai.

| Jun 12, 2017

Accelerate Live! talk: Preparing for the AI revolution, Alan Robles, Gensler

Gensler’s Alan Robles shares how the AEC Giant firm is preparing its project teams and clients for the coming artificial intelligence movement.

| May 24, 2017

Accelerate Live! talk: Applying machine learning to building design, Daniel Davis, WeWork

Daniel Davis offers a glimpse into the world at WeWork, and how his team is rethinking workplace design with the help of machine learning tools.

| May 24, 2017

Accelerate Live! talk: Learning from Silicon Valley - Using SaaS to automate AEC, Sean Parham, Aditazz

Sean Parham shares how Aditazz is shaking up the traditional design and construction approaches by applying lessons from the tech world.

| May 24, 2017

Accelerate Live! talk: The data-driven future for AEC, Nathan Miller, Proving Ground

In this 15-minute talk at BD+C’s Accelerate Live! (May 11, 2017, Chicago), Nathan Miller presents his vision of a data-driven future for the business of design.

AEC Tech | May 23, 2017

A funny thing may happen on the way to AI

As AI proves safe, big business will want to reduce overhead.

AEC Tech | May 11, 2017

Accelerate Live!: Social media reactions from BD+C's AEC innovation conference

BD+C's inaugural Accelerate Live! innovation conference took place May 11, in Chicago.

AEC Tech | Feb 16, 2017

Positioning computational designers in your business: 4 things to consider

There appears to be very little industry consensus as to what a ‘computational design’ position actually means in a business setting.

AEC Tech | Jan 30, 2017

Building Design+Construction launches Accelerate Live! AEC innovation conference

This fast-paced forum will showcase 18 business and tech visionaries from AEC Giant firms, who will explore the future of the AEC industry and the changing built environment.

boombox1
boombox2
native1

More In Category


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021