flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

What you missed: Last week's top construction market news

What you missed: Last week's top construction market news

AIA, Gilbane, DBIA, and USGBC released major reports last week. Here's a roundup of the latest market news for the nonresidential construction industry. 


By BD+C Staff | August 20, 2013

AIA, Gilbane, DBIA, and USGBC released major reports last week. Here's a roundup of the latest market news for the nonresidential construction industry. 

 

 

 

 

 

 

 

 

DESIGN-BUILD PROJECT DELIVERY HOLDS STEADY AT NEARLY 40% OF NONRESIDENTIAL CONSTRUCTION

About 80% of military work is now design-build. Over 40% of commercial and healthcare work, ditto. DBIA study. Read the report

 

 

NONRESIDENTIAL CONSTRUCTION FINALLY GAINING MOMENTUM: GILBANE SUMMER ECON REPORT

Growth predicted for second half of 2013 and into 2014. Availability of skilled workers and increasing materials prices will be an issue. Lenders still cautious. Read the report

 

 

SLUGGISH GAINS IN ARCHITECT COMPENSATION DUE TO WEAKNESS IN CONSTRUCTION SECTOR: AIA SURVEY

Average annual staff compensation increases from 2011 to 2013 were only a bit more than 1%. Bigger firms pay more in general. Read the report

 

 

USGBC JOINS FORCES WITH GREEN SPORTS ALLIANCE TO PROMOTE SUSTAINABLE VENUES

Pro and collegiate sports embracing LEED. 25 venues currently certified. Alliance includes more than 180 pro and collegiate sports teams and venues. Read the report

Related Stories

| Oct 4, 2011

GREENBUILD 2011: Large diameter polypropylene-random pipe unveiled

Available in North America for large scale piping applications including high-rise buildings, large chilled water systems, district energy, and water mains. 

| Oct 4, 2011

GREENBUILD 2011: Ready-to-use wood primer unveiled

Maintains strong UV protection, clarity even with application of lighter, natural wood tones.

| Oct 4, 2011

GREENBUILD 2011: Two new recycled glass products announced

The two collections offer both larger and smaller particulates. 

| Oct 4, 2011

GREENBUILD 2011: Mythic Paint launches two new paint products

A high performance paint, and a combination paint and primer now available. 

| Oct 4, 2011

GREENBUILD 2011: Wall protection line now eligible to contribute to LEED Pilot Credit 43

The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification.

| Oct 3, 2011

Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood

Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction. 

| Oct 3, 2011

Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.

| Oct 3, 2011

Cauceglia to lead Allsteel’s global accounts

Cauceglia is responsible for developing new global business strategies and expanding existing business within the Fortune 500 sector.

| Sep 30, 2011

BBS Architects & Engineers completes welcoming center at St. Charles Resurrection Cemetery

The new structure serves as the cemetery's focal architectural point and center of operations.  

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021