flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

What you missed: Last week's top construction market news

What you missed: Last week's top construction market news

AIA, Gilbane, DBIA, and USGBC released major reports last week. Here's a roundup of the latest market news for the nonresidential construction industry. 


By BD+C Staff | August 20, 2013

AIA, Gilbane, DBIA, and USGBC released major reports last week. Here's a roundup of the latest market news for the nonresidential construction industry. 

 

 

 

 

 

 

 

 

DESIGN-BUILD PROJECT DELIVERY HOLDS STEADY AT NEARLY 40% OF NONRESIDENTIAL CONSTRUCTION

About 80% of military work is now design-build. Over 40% of commercial and healthcare work, ditto. DBIA study. Read the report

 

 

NONRESIDENTIAL CONSTRUCTION FINALLY GAINING MOMENTUM: GILBANE SUMMER ECON REPORT

Growth predicted for second half of 2013 and into 2014. Availability of skilled workers and increasing materials prices will be an issue. Lenders still cautious. Read the report

 

 

SLUGGISH GAINS IN ARCHITECT COMPENSATION DUE TO WEAKNESS IN CONSTRUCTION SECTOR: AIA SURVEY

Average annual staff compensation increases from 2011 to 2013 were only a bit more than 1%. Bigger firms pay more in general. Read the report

 

 

USGBC JOINS FORCES WITH GREEN SPORTS ALLIANCE TO PROMOTE SUSTAINABLE VENUES

Pro and collegiate sports embracing LEED. 25 venues currently certified. Alliance includes more than 180 pro and collegiate sports teams and venues. Read the report

Related Stories

| Sep 12, 2011

LACCD’s $6 billion BIM connection

 The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.

| Sep 12, 2011

Construction waste management

Best practices for an environmentally optimized job site.

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 12, 2011

Geist opens European branch

The new branch provides the company’s international clients with additional support and services.

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Sep 9, 2011

Hardinger joins Ryan Companies as vice president, mission critical

He will lead the Ryan team responsible for building and developing data centers and other mission-critical projects, and will oversee business development, client relationships, executive level communications and overall marketing strategies for the division.

| Sep 7, 2011

KSS Architects wins AIA NJ design award

The project was one of three to win the award in the category of Architectural/Non-Residential. 

| Sep 6, 2011

Construction on Beijing's tallest building starts next week

The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on the lower floors.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021