flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Work begins on KPF's 'flared silhouette' tower in Manhattan

High-rise Construction

Work begins on KPF's 'flared silhouette' tower in Manhattan

The 62-story, 157-unit luxury condo tower widens at the 40th floor, resulting in a gently flared silhouette, accented by a sculpted crown.


By Mike Chamernik, Associate Editor | July 28, 2015
New York, Manhattan, condos, luxury, Kohn Pedersen Fox Associates

Renderings courtesy Kohn Pedersen Fox Associates

Construction has commenced on the tapered tower at 111 Murray Street in Manhattan, according to Architizer.

Designed Kohn Pedersen Fox Associates, the 480,000-sf, 62-story tower is located in the middle of Tribeca, near One World Trade Center. 

The 157-unit condominium building will certainly be elegant. Architect David Rockwell's plans for the lobby include anodized steel walls and travertine floors, while bathrooms will have Calacatta Lincoln Marble walls and floors.

The building will have 20,000 sf worth of amenities, including a lounge with a reflecting pool, and a spa. Water fountains and artistic sculptures will be at the building's base. Construction is scheduled to be completed in 2018.

KPF's description of the project:
Rising 62 floors above the intersection of Murray and West Streets, 111 Murray brings 157 luxury residential units to the Tribeca neighborhood of Manhattan. The tower distinguishes itself from most conventionally developed projects by providing additional real estate where it is most wanted - above surrounding buildings. An increase in floor plate size above the 40th floor results in a gently flared silhouette, accented by a sculpted crown, gesturing openly to the midtown skyline.

The planning and design of the project emerges from close consideration of the urban context and the programmatic needs of the units themselves. The building is oriented on the site to capture the best unobstructed river and city views and to promote a lively pedestrian environment. The softly curving form of the entry and large canopy establish a point of arrival and create a front door with a residential character and scale.

With the addition of a public plaza, residential gardens, and retail and residential amenities, the project mediates between the fine grained scale of the neighborhood fabric and the new urban development in Lower Manhattan.

 

Related Stories

Green | Feb 3, 2017

Nanjing Green Towers will be Asia’s first vertical forest

The project will be covered in 1,100 trees and 2,500 cascading plants and shrubs.

Reconstruction & Renovation | Feb 2, 2017

$500 million investment will modernize Chicago’s Willis Tower *Updated*

The project will be the first major renovation in the building’s 43-year history.

High-rise Construction | Feb 1, 2017

Rippled tower from CORE will be first of 10-tower master plan in Mississauga, Ont.

The tower will become the tallest building in what is Canada’s 6th largest city.

High-rise Construction | Jan 31, 2017

Chicago’s West Loop to receive 500-foot apartment tower

The 44-story tower will provide 492 rental units and a retail podium.

High-rise Construction | Jan 27, 2017

Silverstein Properties waffles on what to do with Far West Side property

The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Architects | Jan 24, 2017

Politicians use architectural renderings in bid to sell Chicago’s Thompson Center

The renderings are meant to show the potential of the site located in the heart of the Chicago Loop.

High-rise Construction | Jan 23, 2017

Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016

This marks the third consecutive record-breaking year for building completions over 200 meters.

High-rise Construction | Jan 20, 2017

CTBUH’s tall building predictions for 2017

Woodscrapers, the automobile industry's expansion into the tall building development business, and Nairobi's climb toward becoming Africa's skyscraper hub are just a few of the topics CTBUH's 2017 tall building predictions report focuses on.

High-rise Construction | Jan 19, 2017

Goettsch Partners to design Shenzhen-based headquarters complex

The Chicago architecture firm won a design competition for the project anticipated to be completed in 2019.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021