flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World's best new skyscrapers [slideshow]

World's best new skyscrapers [slideshow]

The Bow in Calgary and CCTV Headquarters in Beijing are among the world's best new high-rise projects, according to the Council on Tall Buildings and Urban Habitat. 


By BD+C Staff | July 10, 2013
A jury of high-rise design and construction professionals has selected four regional winners in the Council on Tall Buildings and Urban Habitat's 2013 Best Tall Building Awards, which honor the world's best new skyscrapers each year. One of the four projects will be named “Best Tall Building Worldwide” at the CTBUH 12th Annual Awards Ceremony and Dinner, November 7 in Chicago.
 
The four regional winners are: The Bow in Calgary, Canada (Americas); CCTV in Beijing, China (Asia and Australia); The Shard in London, United Kingdom (Europe); and Sowwah Square in Abu Dhabi, United Arab Emirates (Middle East and Africa). The winners were selected from a pool of 60-plus entries.
 
“The winners and finalists include some of the most striking buildings on the global landscape,” said Jeanne Gang, awards jury chair and Principal of Studio Gang Architects. “They represent resolutions to a huge range of contemporary issues, from energy consumption to integration with the urban realm on the ground.”
 
Here's a look at the four regional winners (images and descriptions courtesy CTBUH):
 
 

The Bow

 

 
 
Location: Calgary
Height: 779 feet; 58 stories
Function: Office
Completed: 2012
 
Building Team
Owner/Developer: H+R Reit
Design Architect: Foster + Partners
Associate Architect: Zeidler Partnership Architects
Structural Engineer: Halcrow Yolles
MEP Engineer: Cosentini
Project Manager: Matthews Southwest Canada
Main Contractor: Ledcor Construction Ltd.
Other Consultants: RWDI; Otis Elevator Company
 
 
 
 

 

 

 

CCTV Headquarters

 

 
Location: Beijing
Height: 768 feet; 54 stories
Function: Office
Completed: 2012
 
Building Team
Owner: China Central Television
Developer: General Office of CCTV New Site Construction & Development Program
Design Architect: Office for Metropolitan Architecture
Associate Architect: ECADI
Structural Engineers: Ove Arup & Partners; East China Architectural Design and Research
MEP Engineer: Ove Arup & Partners
Project Manager: Office for Metropolitan Architecture
Main Contractor: China State Construction
Other Consultants: RWDI
 
 
 
 
 
 

[pagebreak]

Al Khatem Tower

 

 
Location: Abu Dhabi
Height: 509 feet
Function: Office
Completed: 2012
 
Building Team
Owner/Developer: Mubadala Real Estate & Infrastructure
Design Architect: Goettsch Partners
Structural Engineer: Oger International
MEP Engineer: Oger International
Project Manager: Mubadala Real Estate & Infrastructure
Main Contractor: Oger Abu Dhabi
 
 
 
 
 
 

The Shard

 

 
Location: London
Height: 1004 feet
Function: Mixed use (residential, office, hotel)
Completed: 2013
 
Building Team
Owner: London Bridge Quarter Ltd
Developer: Sellar Property Group
Design Architect: Renzo Piano Building Workshop
Associate Architect: Adamson Associates
Structural Engineer: WSP Group
MEP Engineer: Arup
Project Manager: Turner & Townsend
Main Contractor: Mace
Material Suppliers: Permasteelisa Group
Other Consultants: RWDI, KONE, Dow Corning Corporation, AECOM
 
 
 

Related Stories

| Mar 5, 2012

Tishman constructing new courthouse in Philadelphia

Construction is underway for the Pennsylvania Department of General Services’ 510,000-sf facility.

| Mar 2, 2012

By the Numbers

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs. 

| Mar 1, 2012

Intelligent construction photography, not just pretty pictures

Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.

| Feb 29, 2012

Report says BIPV glass market to reach $6.4 billion by 2016

The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.

| Feb 27, 2012

Consigli complete first building for Bigelow Ocean Sciences Campus

Designed by WBRC Architects Engineers in association with Perkins + Will.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 22, 2012

CISCO recognizes Gilbane for quality construction, design, and safety

The project employed more than 2,000 tradespeople for a total of 2.1 million hours worked – all without a single lost-time accident. 

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

| Feb 21, 2012

PV America West conference showcases solar growth market

Solar industry gathers March 19-21, 2012 in San Jose to discuss technology, market development and policy.

| Feb 21, 2012

SMPS announces Build Business 2012 keynote speakers

National conference set for July 11–13 in San Francisco.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



Glass and Glazing

The next generation of thermal glazing: How improving U-value can yield energy savings and reduce carbon emissions

The standards for energy-efficient construction and design have been raised. Due to the development of advanced low-e coatings for the interior surface and vacuum insulating technologies, architects now have more choices to improve U-values wherever enhanced thermal performance is needed to create eco-friendly spaces. These options can double or even triple thermal performance, resulting in annual energy savings and a positive return on carbon.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021