flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World's largest market-rate, Phius Design-certified multifamily high-rise begins leasing

High-rise Construction

World's largest market-rate, Phius Design-certified multifamily high-rise begins leasing

42 Broad brings 249 sustainable luxury apartments to New York's Westchester County.


By Quinn Purcell, Managing Editor | July 25, 2023
42 Broad rooftop patio amenity
42 Broad's rooftop lawn overlooking Mt Vernon. Photo © Katherine Marks, courtesy 42 Broad

Earlier this month, leasing launched for the world's largest market-rate, Phius-certified multifamily high-rise, 42 Broad. The structure has achieved Phius Passive House Design Certification and brings nearly 250 luxury apartments to Mount Vernon, N.Y.

The units at 42 Broad provide efficient Energy Star appliances, spa-inspired bathrooms, and nine-foot ceilings. Select penthouse suites come with upscaled fixtures, Manhattan skyline views, and real wood cabinetry. All 249 units feature efficient HVAC systems and filtered air ventilation.

Phius-standard features

42 Broad achieved the Phius+ 2015 Passive Building Standards for multifamily residences. This Phius (Passive House Institute US) standard represents a "sweet spot" for aggressive decarbonization and energy reduction, while remaining cost-effective. Overall, buildings that adhere to Phius standards offer occupants a more comfortable environment.

Luxury new Phius-certified apartment living room
Residence living room at 42 Broad. Photo © Katherine Marks, courtesy 42 Broad

The 42 Broad project team believes the 16-story building will use up to 80% less energy for heating and cooling. This comes in large part from its high performance windows, Passive House insulation, and smart building systems that monitor energy usage. What this means for residents is a comfortable living temperature, healthy indoor air, lower utility bills, and superior sound reduction.

Design architect Perkins Eastman aimed to appeal to a variety of prospective renters looking for a sustainable luxury home. 42 Broad also comes with more than 20,000 sf of programmed amenities in addition to its selection of studio, one- and two-bedroom units.

"We believe the homes will appeal to renters from all walks of life, including empty nesters looking to downsize and young professionals seeking more living space in close proximity to Manhattan," said Mark Alexander, Co-founder and Principal, Alexander Development Group.

Programmed amenities at 42 Broad
 

Gym room at 42 Broad, Phius-certified apartment complex
Fully-equipped fitness center. Photo © Katherine Marks, courtesy 42 Broad

The amenities at 42 Broad are designed for those who "work, entertain, get fit, and let loose." Community luxuries include a zen garden courtyard, coworking spaces, a fully equipped gym, and library. It even provides services from dog walking to valet dry cleaning. Concierge services are managed by Bozzuto’s nationally-recognized property management division.

Other amenities include electric car charging stations, bike storage, a roof deck with outdoor kitchens, large community room, and pet grooming stations.

42 Broad was "designed with momentum in mind." The residence sits three blocks from New York's Metro-North Railroad Harlem Line, offering quick access to nearby locations. It will also bring retail space to the building's ground floor later this year.

Rendering of 42 Broad Phius-certified apartment complex
42 Broad exterior and heated three-season pool with shaded pergolas. Renderings courtesy 42 Broad

On the Building Team:
Owner: J.P. Morgan
Owner/Developers: Alexander Development Group and The Bluestone Organization
Architect: Perkins Eastman
Architect of Record: Stuart Lachs
Structural Engineer: De Simone Consulting Engineering
MEP Engineer: Sideris Kefalas Engineers P.C. Consulting Engineers
Phius-Certified Verifier: Jamison Hill
General Contractor: Banta Homes Corp.

Related Stories

High-rise Construction | Jun 28, 2016

CTBUH names winners and finalists for 2016 Tall Building Awards

Eight winners were named in five categories that recognized tall buildings, urban habitats, innovation, performance, and decade-long excellence.

High-rise Construction | Jun 15, 2016

WilkinsonEyre designs diamond-patterned Bay Park Centre for Toronto

A sloping plaza with trees, grass, and gardens connects the two downtown towers.

Sponsored | High-rise Construction | Jun 13, 2016

Marilyn Monroe’ tower adds curves to the Toronto skyline

Made of glass, concrete, and steel, the 56-story tower has been dubbed the "Marilyn Monroe" because of its curving lines.

High-rise Construction | Jun 7, 2016

Gensler’s Gateway Tower picks up where Calatrava's Chicago Spire left off

A new 2,000-foot tower has been proposed for a site that is currently a non-monument to an abandoned plan.

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

Building Team Awards | May 20, 2016

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.

High-rise Construction | May 17, 2016

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

One of Oceanwide Center’s buildings will be the city’s second tallest. 

Green | May 16, 2016

Development team picked for largest Passive House project in North America

The 24-story curved building would be 70% more efficient than comparable housing in New York City.

High-rise Construction | May 2, 2016

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.  

Wood | Apr 29, 2016

Anders Berensson Architects designs 40-story wooden skyscraper for Stockholm

The structure, which will be made entirely out of cross-laminated timber, will rise 436 feet into the air, making it Stockholm’s tallest building.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021