flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World’s tallest detached-core building completes in Shenzhen

Mixed-Use

World’s tallest detached-core building completes in Shenzhen

Morphosis designed the project.


By David Malone, Associate Editor | June 2, 2021

Photo: Zhang Chao

Hanking Center, an 1,180-foot-tall mixed-use complex with a commercial office tower and retail center, has completed in Shenzhen, China. The 65-story tower is currently the tallest detached-core building in the world.

The slender profile of the tower emerges above a low-rise retail podium that features angled facets, shadowing the form of the tower above. A series of glass sky bridges and steel mega-braces knit the offset core to the main body of the tower. At ground level, the Center is accessible by multiple entrances and is set within a landscaped public plaza, ensuring a permeable site that invites the public into the retail podium.

The tower’s steel structural system and detached-core configuration, which positions the tower’s primary core on the building’s exterior, promotes higher efficiency and adaptability of interior floor plates. This enhances the tower’s ability to service the varying needs of its occupants. The detached-core configuration also allows for an innovative approach to internal circulation and the creation of social and work spaces that integrate public and private domains. Two secondary cores in the body provide additional structural reinforcement and house mechanical services such as freight and VIP elevators.

By shifting the primary movement and service core outside the main body of the tower, the design minimizes the building’s structural footprint while maximizing open spaces inside the tower. The exoskeletal frame bends and straightens to expand and contract interior floor sizes.

The open floor plates allow for enhanced natural light and airflow. Tenants move from circulation around the core to quieter perimeter offices, creating a public to private gradient. Folded angles are used to merge public components in the podium with private commercial space in the tower. Inside the retail podium, a tapered atrium draws natural light down into the mall creating an inviting interior environment for the public. A grand plaza and dimensional hardscape surrounds the tower’s podium to create a new neighborhood landmark that enhances public activity at the street level.

The project completed in 2018 with a gradual opening that continued into 2021.

Tags

Related Stories

Mixed-Use | Mar 11, 2019

Podcast: Sterling Bay’s Andy Gloor discusses Chicago’s grandiose Lincoln Yards Plan

Lincoln Yards is Sterling Bay’s ambitious riverfront development of formerly industrial land between Bucktown and Lincoln Park.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

Mixed-Use | Feb 19, 2019

Sunset Library in Brooklyn will be capped with 50 affordable residences

Magnusson Architecture and Planning is designing the facility.

Mixed-Use | Feb 18, 2019

Seaport World Trade Center will offer Bostonians 737,000 sf of waterfront mixed-use space

Schmidt Hammer Lassen Architects is designing the project.

Mixed-Use | Jan 22, 2019

Mixed-use skyscraper rises in the heart of metropolitan Tokyo

Pickard Chilton designed the building.

Mixed-Use | Dec 14, 2018

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

The mixed-use development will connect some of Detroit’s key public spaces.

Mixed-Use | Dec 10, 2018

Luxury residential development completes in downtown Charleston

JE Dunn was the general contractor for the project and The Preston Partnership is the architect of record.

Mixed-Use | Nov 7, 2018

53-story L.A. tower has a series of 12 cantilevered pools

Arquitectonica is designing the building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021