flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World’s tallest detached-core building completes in Shenzhen

Mixed-Use

World’s tallest detached-core building completes in Shenzhen

Morphosis designed the project.


By David Malone, Associate Editor | June 2, 2021

Photo: Zhang Chao

Hanking Center, an 1,180-foot-tall mixed-use complex with a commercial office tower and retail center, has completed in Shenzhen, China. The 65-story tower is currently the tallest detached-core building in the world.

The slender profile of the tower emerges above a low-rise retail podium that features angled facets, shadowing the form of the tower above. A series of glass sky bridges and steel mega-braces knit the offset core to the main body of the tower. At ground level, the Center is accessible by multiple entrances and is set within a landscaped public plaza, ensuring a permeable site that invites the public into the retail podium.

The tower’s steel structural system and detached-core configuration, which positions the tower’s primary core on the building’s exterior, promotes higher efficiency and adaptability of interior floor plates. This enhances the tower’s ability to service the varying needs of its occupants. The detached-core configuration also allows for an innovative approach to internal circulation and the creation of social and work spaces that integrate public and private domains. Two secondary cores in the body provide additional structural reinforcement and house mechanical services such as freight and VIP elevators.

By shifting the primary movement and service core outside the main body of the tower, the design minimizes the building’s structural footprint while maximizing open spaces inside the tower. The exoskeletal frame bends and straightens to expand and contract interior floor sizes.

The open floor plates allow for enhanced natural light and airflow. Tenants move from circulation around the core to quieter perimeter offices, creating a public to private gradient. Folded angles are used to merge public components in the podium with private commercial space in the tower. Inside the retail podium, a tapered atrium draws natural light down into the mall creating an inviting interior environment for the public. A grand plaza and dimensional hardscape surrounds the tower’s podium to create a new neighborhood landmark that enhances public activity at the street level.

The project completed in 2018 with a gradual opening that continued into 2021.

Tags

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021