A mixed-use tower currently under construction in Beijing’s Lize Financial Business District will be notable not for its two twisting sections, but for what unites these sections: a 190-meter tall atrium that rises almost the full height of the building. The atrium will surpass the 180-meter tall atrium found in the Burj Al Arab hotel in Dubai as the world’s tallest.
According to ArchDaily, the atrium will unite the two twisting sections that contain a total of 172,800 sm of office and residential space. The building, dubbed Leeza SOHO, will also provide a new transit hub at its base that straddles a subway tunnel currently under construction.
The two sections of the building are split at the base to align with the new subway tunnel, but as the tower rises, the atrium twists 45 degrees to align with Lize Road, which is a major road in southwest Beijing. The atrium will provide a new indoor public space for the city and supplement the plaza the surrounding plaza.
The 207-meter building will be completed in 2018 and comprise 46 floors. Construction is underway with 20 floors already completed.
Rendering courtesy of MIR.
Rendering courtesy of MIR.
Rendering courtesy of MIR.
Related Stories
High-rise Construction | Jun 28, 2016
CTBUH names winners and finalists for 2016 Tall Building Awards
Eight winners were named in five categories that recognized tall buildings, urban habitats, innovation, performance, and decade-long excellence.
High-rise Construction | Jun 15, 2016
WilkinsonEyre designs diamond-patterned Bay Park Centre for Toronto
A sloping plaza with trees, grass, and gardens connects the two downtown towers.
Sponsored | High-rise Construction | Jun 13, 2016
Marilyn Monroe’ tower adds curves to the Toronto skyline
Made of glass, concrete, and steel, the 56-story tower has been dubbed the "Marilyn Monroe" because of its curving lines.
High-rise Construction | Jun 7, 2016
Gensler’s Gateway Tower picks up where Calatrava's Chicago Spire left off
A new 2,000-foot tower has been proposed for a site that is currently a non-monument to an abandoned plan.
Codes and Standards | May 25, 2016
LEED Dynamic is worth the effort, says commercial real estate executive
San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.
Building Team Awards | May 20, 2016
Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness
The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.
High-rise Construction | May 17, 2016
Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco
One of Oceanwide Center’s buildings will be the city’s second tallest.
Green | May 16, 2016
Development team picked for largest Passive House project in North America
The 24-story curved building would be 70% more efficient than comparable housing in New York City.
High-rise Construction | May 2, 2016
UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower
The 1,186-foot tower will be the third-tallest building in the city.
Wood | Apr 29, 2016
Anders Berensson Architects designs 40-story wooden skyscraper for Stockholm
The structure, which will be made entirely out of cross-laminated timber, will rise 436 feet into the air, making it Stockholm’s tallest building.