An existing apartment building on the corner of Fountain and North Harper Avenue in West Hollywood will be replaced by a new 17-unit, 23,000-sf condominium complex designed by SPF:architects.
The complex, named Harper17, was designed so all but three of the 17 apartments will be corner units. A raised “front yard” was created by taking half of the structure and setting it back by 30 feet. A second courtyard is located in the center of the building. Additional private rooftop terraces will be included with each top floor unit. Individual decks and patios are included with the remaining units to ensure all residents have a strong connection to nature.
Rendering courtesy of SPF:a.
In an effort to enhance the first floor units and make them feel more like single-family homes, they have been isolated and provided with dedicated above-ground parking. Parking for the rest of the units will be distributed across the subterranean level.
See Also: Multifamily market remains healthy – Can it be sustained?
Harper17’s exterior will be dominated by bronze perforated aluminum geometrically arranged against smooth white cement board panels. “The panel system gives the building a strong style profile, but ultimately its most important function is programmatic,” says Zoltan E. Pali, FAIA, SPF:a’s Founder and Design Principal. “The precise way we patterned the aluminum and cement panels defines and separates the individual living spaces, resulting in a feel that’s more like a home amidst a community and less like the ubiquitous and repetitious apartment or condo compound.”
Construction is expected to begin on Harper17 in spring 2019.
Rendering courtesy of SPF:a.
Rendering courtesy of SPF:a.
Rendering courtesy of SPF:a.
Rendering courtesy of SPF:a.
Related Stories
| Jul 20, 2012
2012 Giants 300 Special Report
Ranking the leading firms in Architecture, Engineering, and Construction.
| Jul 19, 2012
Rental market pushing service, ‘community’
The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
Oakdale, Calif., Heritage Oaks Senior Apartments opens
New complex highlights senior preferences for amenities.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 2, 2012
Building Team completes two additions at UCLA
New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.