Located on Summer Street and adjacent to The Silos on Sawyer in Houston’s Washington Avenue Arts District, the Buffalo Bayou Brewing Co.’s new three-story, 28,000 sf brewery and full-service restaurant will offer multi-sensory watching, drinking, and eating experiences.
Guests will enter the new building through a 25-foot-tall buffalo-shaped gateway and enter the first-floor production area. Brewing-view windows run along the expanse of the brew floor. The first floor also opens to an outside dog-friendly beer garden.
Rendering courtesy of Method Architecture.
The second floor includes a 200 seat full-service restaurant that offers panoramic views of downtown Houston. The third floor comprises a private event room with a dedicated balcony and a 5,600-sf open-air roof deck. The deck provides views of Houston’s skyline but also allows guests to peer down through a 30-foot skylight into the production area.
Rendering courtesy of Method Architecture.
The new brewery and restaurant will feature reclaimed wood, a mixture of metals and brick, translucent panels, and murals featuring local Houston artists.
The project is expected to be completed by the end of 2018. Along with Method, the project team consists of H2B, Inc., Dawson Van Orden, Pinnacle Structural Engineering, Wong and Associates, and Earth Engineering.
Rendering courtesy of Method Architecture.
Rendering courtesy of Method Architecture.
Related Stories
| Jul 20, 2012
Global boom for hotels; for retail, not so much
The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.
| Jul 17, 2012
KM/Plaza changes name to Plaza Construction
Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 19, 2012
KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed
First of eight buildings highlights unique amenities.
| Apr 16, 2012
University of Michigan study seeks to create efficient building design
The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.