Located on Summer Street and adjacent to The Silos on Sawyer in Houston’s Washington Avenue Arts District, the Buffalo Bayou Brewing Co.’s new three-story, 28,000 sf brewery and full-service restaurant will offer multi-sensory watching, drinking, and eating experiences.
Guests will enter the new building through a 25-foot-tall buffalo-shaped gateway and enter the first-floor production area. Brewing-view windows run along the expanse of the brew floor. The first floor also opens to an outside dog-friendly beer garden.
Rendering courtesy of Method Architecture.
The second floor includes a 200 seat full-service restaurant that offers panoramic views of downtown Houston. The third floor comprises a private event room with a dedicated balcony and a 5,600-sf open-air roof deck. The deck provides views of Houston’s skyline but also allows guests to peer down through a 30-foot skylight into the production area.
Rendering courtesy of Method Architecture.
The new brewery and restaurant will feature reclaimed wood, a mixture of metals and brick, translucent panels, and murals featuring local Houston artists.
The project is expected to be completed by the end of 2018. Along with Method, the project team consists of H2B, Inc., Dawson Van Orden, Pinnacle Structural Engineering, Wong and Associates, and Earth Engineering.
Rendering courtesy of Method Architecture.
Rendering courtesy of Method Architecture.
Related Stories
| Feb 8, 2012
Mega-malls expanding internationally
Historically, malls have always been the icons of America – the first mall ever was built in Minneapolis in 1956.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Jan 6, 2012
Summit Design+Build completes Park Place in Illinois
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Oct 26, 2011
Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.
New store features 1,200 sf fit out at Aventura Mall.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.