flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

512 West 22nd Street: Biophilic design on the High Line

Office Buildings

512 West 22nd Street: Biophilic design on the High Line

COOKFOX Architects designed the project.


By David Malone, Associate Editor | May 27, 2020
512 West 22nd Street roof terrace

All photos: Bruce Damonte

Located on the High Line at a spot known as the Chelsea Thicket, 512 West 22nd Street is a new office building inspired by its proximity to the park’s public space and its location with connection to and views of the Hudson River. 

The building, designed via principles of biophilia, is unusual in that the planted areas of the roof, staircase, and terraces represent greater square footage than its footprint. 512 features over 15,000 sf of outdoor space. Landscaped terraces populated solely with native species are cut into the building’s profile on every floor. Continuous stepped terraces from levels two to four are designed for outdoor circulation, events, and other uses for tenants, while at the second and third floors the branches of the thicket meet the overhang above, margining into a canopy. In total, the planted areas represent 110% of the footprint of the building.

 

512 West 22nd Street exterior

 

Designed to achieve LEED Gold certification, the architectural design includes resiliency features that can withstand 100-year food predictions, an integrated rooftop watering and grey water system, and signature interior columns.

 

512 West 22nd street open lobby

 

The building’s exterior recalls the historical infrastructure and warehouse buildings of the neighborhood and the contemporary design that defines west Chelsea. The building features industrial sash-inspired windows and an anthracite terra-cotta, zinc, and granite facade. The custom terra-cotta profile rotates and opens at the curved edges of the building with glass that arcs around the corners, featuring operable windows that offer more direct control of the environment and access to outdoor air.

The offices include large, light-filled floors with overhead air distribution and filtering systems. Below the office space, the 22nd Street lobby includes a curated event space that can open onto the sidewalk when the pane-glass garage door is lifted. Off the lobby, a landscaped viewing garden offers a calming focal point at the elevator banks.

 

512 west 22nd street office space

 

512 west 22nd street green space and High Line

Related Stories

High-rise Construction | May 23, 2017

Goettsch Partners to design three-building Optics Valley Center complex

The Chicago-based firm won a design competition to design the complex located in Wuhan, China.

Office Buildings | Apr 18, 2017

Heineken USA Headquarters redesign emphasizes employee interaction

An open plan with social hubs maximizes co-working and engagement.

Office Buildings | Apr 17, 2017

Vertical integration triggers growth for an L.A.-based office furniture provider

Customization and technology drive sales for Tangram Interiors.

Market Data | Apr 13, 2017

2016’s top 10 states for commercial development

Three new states creep into the top 10 while first and second place remain unchanged.

Office Buildings | Apr 10, 2017

Innovation lab makes developing eye care solutions a collaborative affair

The Shop East innovation lab presents 13,500 sf of workspace across two floors with an emphasis on collaboration. 

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

High-rise Construction | Apr 4, 2017

Fifth tallest tower in the world opens in Seoul with the world’s highest glass-bottomed observation deck

Lotte World Tower’s glass-bottomed observation deck allows visitors to stand 1,640 feet above ground and look straight down.

Office Buildings | Apr 4, 2017

Amazon’s newest office building will be an ‘urban treehouse’

The building will provide 405,000 sf of office space in downtown Seattle.

Standards | Mar 29, 2017

Wellness movement is catching on with AEC firms

Hord Caplan Macht the latest to join the club by submitting its offices for certification under Fitwel’s program.

BIM and Information Technology | Mar 28, 2017

Digital tools accelerated the design and renovation of one contractor’s new office building

One shortcut: sending shop drawings created from laser scans directly to a wood panel fabricator.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021