1. As cities scramble for hospital beds to treat COVID-19 patients, Leo A Daly offers a hotel-to-hospital solution (BD+C)
Leo A Daly is currently negotiating with several hoteliers about converting large portfolios of hotels into healthcare facilities that follow the firm’s Hotel2Hospital prototype, which would conform with design guidelines released last week to state governments by the U.S. Army Corps of Engineers, which relax some of the hospital safety standards.
2. New South Korean retail building looks like a molting insect (BD+C)
The building, Galleria’s sixth branch, has a very unique design to say the least. The facade combines multifaceted glass that appears to be breaking out from within opaque stone, as if the building was shedding its old skin and revealing the new.
3. How to convert college dorms to support the coronavirus crisis (NBBJ)
With the number of global coronavirus cases increasing each day, health centers are more burdened than ever before, witnessing severe bed shortages for critically-ill patients. At the same time, housing at many higher education institutions now stands mostly vacant — with hundreds of thousands of students home for social distancing and instruction now delivered online.
4. COVID-19's impact on the multifamily sector (BD+C)
COVID-19 is taking its toll on the U.S. vertical construction market. In a March 23-26 survey by the Associated General Contractors of America, 20% of the 659 respondents from "buildings contractors" reported projects being shut down or delayed by government officials, while 45% of those surveyed said an owner had instructed them to halt or cancel construction on a current or planned project.
5. Number of confirmed delayed projects reaches 2,550 in the U.S., 1,350 in Canada (ConstructConnect)
ConstructConnect's Delayed Project Tracker is updated daily.
6. Climate-informed HVAC increases in relative humidity may fight pandemic viruses (SmithGroup)
Indoor relative humidity is a function of seasonal climate and building HVAC. The range of 40% to 60% RH may reduce contagion and help those who are infected.
7. Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility (Walsh Construction)
"Walsh Construction is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility for novel coronavirus patients."
For more top stories from BD+C,
sign up for the BD+C Daily 5 newsletter
Related Stories
Hotel Facilities | Sep 6, 2017
Marriott has the largest construction pipeline of any franchise company in the U.S.
Marriott has the most rooms currently under construction with 482 Projects/67,434 Rooms.
Market Data | Sep 5, 2017
Nonresidential construction declines again, public and private sector down in July
Weakness in spending was widespread.
Market Data | Aug 29, 2017
Hidden opportunities emerge from construction industry challenges
JLL’s latest construction report shows stability ahead with tech and innovation leading the way.
Market Data | Aug 28, 2017
U.S. hotel construction pipeline is up 7% year-over-year
For the economy, the rate of growth may be low but it’s running on all cylinders.
Market Data | Aug 23, 2017
Architecture Billings Index growth moderates
“The July figures show the continuation of healthy trends in the construction sector of our economy,” said AIA Chief Economist, Kermit Baker.
Architects | Aug 21, 2017
AIA: Architectural salaries exceed gains in the broader economy
AIA’s latest compensation report finds average compensation for staff positions up 2.8% from early 2015.
Market Data | Aug 20, 2017
Some suburban office markets are holding their own against corporate exodus to cities
An analysis of mortgage-backed loans suggests that demand remains relatively steady.
Market Data | Aug 17, 2017
Marcum Commercial Construction Index reports second quarter spending increase in commercial and office construction
Spending in all 12 of the remaining nonresidential construction subsectors retreated on both an annualized and monthly basis.
Industry Research | Aug 11, 2017
NCARB releases latest data on architectural education, licensure, and diversity
On average, becoming an architect takes 12.5 years—from the time a student enrolls in school to the moment they receive a license.
Market Data | Aug 4, 2017
U.S. grand total construction starts growth projection revised slightly downward
ConstructConnect’s quarterly report shows courthouses and sports stadiums to end 2017 with a flourish.