flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

76-Story luxury apartment tower in Chicago’s South Loop gets name and begins construction

High-rise Construction

76-Story luxury apartment tower in Chicago’s South Loop gets name and begins construction

The building was designed by Rafael Viñoly and is scheduled for completion in 2019.


By David Malone, Associate Editor | January 6, 2017

Rendering courtesy of Crescent Heights

The new 829-foot-tall residential tower planned for Chicago’s South Loop has received the official name of One Grant Park and will comprise 792 luxury apartments. The tower, which will become one of the city’s tallest residential buildings, began construction at its 1200 S. Indiana Ave., in December.

Included in the building’s almost 800 units will be a mix of studio, one-, two-, and three-bedroom apartments. The residences and common areas will offer state-of-the-art technology and carefully curated amenity spaces designed by the New York-based Rockwell Group.

When completed, One Grant Park will have a glassy façade and feature a step effect that will provide outdoor terraces at varying heights. The design is meant to complement what is arguably the most famous building in Chicago, Willis Tower (formerly Sears Tower). The modular design of One Grant Park will work with the design of the Willis Tower to maintain the cohesiveness of the iconic Chicago skyline.

Beyond the building’s amenities and luxury apartment units, One Grant Park offers residents a home that is just a short walk from the Adler Planetarium, Shedd Aquarium, Field Museum of Natural History, Soldier Field, and jogging and bicycling paths. The building will connect to the 57-acre Museum Campus via a pedestrian tunnel that runs underneath Lake Shore Drive. The downtown business and entertainment districts are also easily accessible from the tower.

One Grant Park represents one of the final pieces of the Central Station master plan, which saw its progress hindered by the 2008 recession.

Related Stories

MFPRO+ New Projects | Oct 30, 2024

BIG’s One High Line finally reaches completion in New York City’s West Chelsea neighborhood

One High Line, a luxury residential project spanning a full city block in New York’s West Chelsea neighborhood, reached completion this summer following years of delays related to investor lawsuits. 

Architects | Aug 28, 2024

KTGY acquires residential high-rise specialist GDA Architects

KTGY, an award-winning design firm focused on architecture, interior design, branded environments and urban design, announced that it has acquired GDA Architects, a Dallas-based architectural firm specializing in high rise residential, hospitality and industrial design.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

High-rise Construction | Jul 29, 2024

Safdie Architects’ Shanghai office tower features glass-enclosed corner garden that ascends the 35-story structure

Safdie Architects has announced the completion of LuOne Mixed-Use Complex—a business, retail, and entertainment development in the Luwan district of Shanghai, China. The mixed-use complex consists of an eight-level retail galleria, which opened in 2018, and a 35-story office tower, which recently reached completion. 

Great Solutions | Jul 23, 2024

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

Adaptive Reuse | Jun 13, 2024

4 ways to transform old buildings into modern assets

As cities grow, their office inventories remain largely stagnant. Yet despite changes to the market—including the impact of hybrid work—opportunities still exist. Enter: “Midlife Metamorphosis.”

Urban Planning | May 28, 2024

‘Flowing’ design emphasizes interaction at Bellevue, Wash., development

The three-tower 1,030,000-sf office and retail development designed by Graphite Design Group in collaboration with Compton Design Office for Vulcan Real Estate is attracting some of the world’s largest names in tech and hospitality. 

Mixed-Use | Apr 4, 2024

Sustainable mixed-use districts: Crafting urban communities

As a part of the revitalization of a Seattle neighborhood, Graphite Design Group designed a sustainable mixed-use community that exemplifies resource conversation, transportation synergies, and long-term flexibility.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021