flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ProConnect Education (K-12 to University) comes to Scottsdale, AZ, Dec 4-6

Education Facilities

ProConnect Education (K-12 to University) comes to Scottsdale, AZ, Dec 4-6

AEC teams to meet with building product manufacturers to discuss supply chain concerns, new products, and technical solutions for K-12 schools and higher education building projects.


By ROBERT CASSIDY, EXECUTIVE EDITOR, BUILDING DESIGN+CONSTRUCTION | April 28, 2022
ProConnect Education Scottdale AZ Dec 4-6, 2022
Product specifiers and manufacturers exchange ideas and develop solutions to design and construction challenges at ProConnect Events like this one. Next up: ProConnect Education. Photo: Robert Cassidy

ProConnect Education is set for Dec 4-6, 2022, at the Andaz Resort & Bungalows, in Scottsdale, Ariz. This event is geared toward AEC professionals and building product manufacturers serving the $108 billion K-12 and University design and construction sector.

Andaz Scottsdale resort
The Andaz Resort & Bungalows will be the site of ProConnect Education, Dec 4-6, in Scottsdale, Ariz.

PROCONNECT EDUCATION (K-12 | University) Dec 4-6

ProConnect EDUCATION (K-12 to University) Dec 4-6, 2022, will bring architects, contractors, and designers in the K-12 schools and higher education sectors to the Andaz Resort & Bungalows, Scottsdale, Ariz., to meet with building product suppliers who specialize in the $108 billion Education design and construction market.

To learn more about participating as an Attendee or Vendor in ProConnect Education 2022, contact Robert Reed, 630-845-1285, rreed@sgcmail.com.

This short video (1:49) provides a feel for the buzz at the event. SGC Horizon has produced 28 ProConnects in the last 4 years. Our 29th ProConnect, ProConnect Multifamily, will be held Oct 26-28 in San Diego.

More than 900 architects, engineers, developers, contractors, and home builders have participated in ProConnect Events.

Progressive Foam table at Proconnect Multifamily Dallas 2022
A manufacturer demonstrates his company's product to a construction manager at ProConnect. Photo: R C​​​​​assidy

To learn more about participating in future ProConnect events as a Vendor or Attendee, contact Dan Gardner, 989-860-7930, dgardner@sgcmail.com.

Lynden Door meeting at ProConnect Multifamily Dallas 2022
A ProConnect Attendee asks about a ventilated door that's recommended for washer-dryer closets. Photo: R Cassidy

NETWORKING FOSTERS LONG-TERM PROFESSIONAL RELATIONSHIPS FOR ATTENDEES AND VENDORS

The 20-minute discussions between Attendees and Vendors – plus the informal networking that takes place during breaks and meals – generate a hum that reverberates throughout the ballroom.

At ProConnect Events, you can feel the excitement in the air. Attendees and Vendors say they like the the compressed information exchange – "a very good use of my time," is the most common response from Attendees and Vendors alike.

Laticrete at ProConnect MF Dallas 2022
Dr Peppers, water bottles, and informative discussion at a ProConnect Multifamily Attendee/Vendor meeting. Photo: RC

ATTENDEES SHARE INFORMATION, IDEAS, AND SOLUTIONS AT PROCONNECT ROUNDTABLES

Attendee Roundtables are a new feature for ProConnect events. Here, Attendees meet in groups of 12-15 for a one-hour moderated discusson of pre-selected agenda items – e.g., "Supply Chain Problems – and Solutions" – and offer each other technical advice and  Post-event surveys show that the Attendee Roundtables have become one of the most popular features of ProConnect events, along with other networking opportunities.

Brilliant demonstrates at ProConnect Multifamily Dallas 2022
One-to-one discussion provides valuable insights for both Attendees and Manufacturers at ProConnect. Photo: RC

To learn more about participating in ProConnect events as a Vendor or Attendee, contact Dan Gardner, 989-860-7930, dgardner@sgcmail.com.

6 MORE PROCONNECT EVENTS COMING IN 2023

SGC Horizon will present 6 ProConnect events in 2023 – dates and locations to be announced soon:

Multifamily (2)

Single Family (2)

Education

Sustainability

To learn more about participating in ProConnect events as a Vendor or Attendee, contact Dan Gardner, 989-860-7930, dgardner@sgcmail.com.

 

Related Stories

Market Data | Aug 1, 2023

Nonresidential construction spending increases slightly in June

National nonresidential construction spending increased 0.1% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. Spending is up 18% over the past 12 months. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.07 trillion in June.

K-12 Schools | Jul 31, 2023

Austin’s new Rosedale School serves students with special needs aged 3 to 22

In Austin, the Rosedale School has opened for students with special needs aged 3 to 22. The new facility features sensory rooms, fully accessible playgrounds and gardens, community meeting spaces, and an on-site clinic. The school serves 100 learners with special needs from across Austin Independent School District (ISD).

Market Data | Jul 24, 2023

Leading economists call for 2% increase in building construction spending in 2024

Following a 19.7% surge in spending for commercial, institutional, and industrial buildings in 2023, leading construction industry economists expect spending growth to come back to earth in 2024, according to the July 2023 AIA Consensus Construction Forecast Panel. 

Mass Timber | Jul 11, 2023

5 solutions to acoustic issues in mass timber buildings

For all its advantages, mass timber also has a less-heralded quality: its acoustic challenges. Exposed wood ceilings and floors have led to issues with excessive noise. Mass timber experts offer practical solutions to the top five acoustic issues in mass timber buildings.

School Construction | Jun 29, 2023

K-12 school construction: 5 ways strong community relations can lead to success

When constructing a K-12 school, building positive relationships with the community—including students, parents, school staff and residents—is critical to the success of the project. Here are five ways Skanska puts the community first when building K-12 schools in the Pacific Northwest.

University Buildings | Jun 26, 2023

Univ. of Calif. Riverside’s plant research facility enables year-round plant growth

The University of California, Riverside’s new plant research facility, a state-of-the-art greenhouse with best-in-class research and climate control technologies, recently held its grand opening. Construction of the two-story, 30,000 sf facility was completed in 2021. It then went through two years of preparation and testing.

University Buildings | Jun 26, 2023

Addition by subtraction: The value of open space on higher education campuses

Creating a meaningful academic and student life experience on university and college campuses does not always mean adding a new building. A new or resurrected campus quad, recreational fields, gardens, and other greenspaces can tie a campus together, writes Sean Rosebrugh, AIA, LEED AP, HMC Architects' Higher Education Practice Leader.

Standards | Jun 26, 2023

New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings

The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

boombox1
boombox2
native1

More In Category


University Buildings

Des Moines University Medicine and Health Sciences opens a new 88-acre campus

Des Moines University Medicine and Health Sciences has opened a new campus spanning 88 acres, over three times larger than its previous location. Designed by RDG Planning & Design and built by Turner Construction, the $260 million campus features technology-rich, flexible educational spaces that promote innovative teaching methods, expand research activity, and enhance clinical services. The campus includes four buildings connected with elevated pathways and totaling 382,000 sf. 



Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021