In the summer of 2009, the Hudson Community School Board (Iowa) approved a major project upgrade, renovating the high school’s original DDC system with the expert help of their local Siemens Solution Partner.
Client Objective
The building’s original 12-year old HVAC system was barely functioning. Faulty and unpredictable, it not only created a less than desirable learning environment, but made troubleshooting of mechanical or controller problems very difficult—costing hundreds of thousands of dollars in wasted time and money over the years.
A Siemens Solution Partner with decades of experience in improving building performance was selected for the job. The project began in early July, with the need for completion by late August, before the return of the high school’s 286 students.
The Siemens Solution Partner proposed the open TALON with BACnet Building Automation System for the 60,000-sf facility, which contains 25 classrooms, a multipurpose room, media room, auditorium, and gymnasium. TALON with BACnet enables a smooth integration with other systems, creating more integration flexibility than other systems on the market.
The TALON system, created to improve every aspect of building automation, would provide the school with the best integration of today’s technology and keep it open for future technology and new products.
The Best Total Solution Approach
TALON seamlessly linked into the high school’s existing infrastructure, giving budget-conscious administrators an immediate appreciation for its cost effectiveness. Its integration power, open architecture, and BACnet software made the TALON system an investment that will continue to pay the school district back for years. Future system integration opportunities include HVAC, lighting, power, process, fire/life safety, and security/access control.
Since TALON makes the necessary connections between systems, it can link the entire district, managing buildings as a whole, not as disparate systems—all from a single workstation. The system can be monitored and controlled from any Web-enabled device, maximizing staff productivity and building performance and minimizing disruptions to events inside the facility.
Contact Info:
For more information, contact Phil Dlatt, 847-941-6033, phil.dlatt@siemens.com; www.usa.siemens.com/talon
Top Honors for High-Performing Control System
Following the completed work, Hudson High School now boasts a state-of-the-art, fully integrated building automation system that incorporates DDC for energy management, equipment monitoring, and control.
The improved control system at Hudson High School has successfully impacted the learning environment, the bottom line, and the buildings most important function: providing a comfortable learning environment for children and teachers.
Related Stories
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 23, 2012
Thornton Tomasetti project wins AISC Merit Award
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.
| Apr 19, 2012
HBD Construction names Steven Meeks vice president
Meeks will provide expertise for the company in its many diverse areas of construction projects including health care, senior living, education and retail.
| Apr 17, 2012
Princeton Review releases “Guide to 322 Green Colleges”
The guide profiles 322 institutions of higher education in the U.S. and Canada that demonstrate notable commitments to sustainability in their academic offerings, campus infrastructure, activities and career preparation.
| Apr 17, 2012
FMI report examines federal construction trends
Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.
| Apr 16, 2012
University of Michigan study seeks to create efficient building design
The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.
| Apr 16, 2012
UNT lab designed to study green energy technologies completed
Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy.
| Apr 16, 2012
Batson-Cook breaks ground on senior living center in Brunswick, Ga.
Marks the third Benton House project constructed by Batson-Cook.
| Apr 13, 2012
Best Commercial Modular Buildings Recognized
Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More
| Apr 6, 2012
Flat tower green building concept the un-skycraper
A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.