In the summer of 2009, the Hudson Community School Board (Iowa) approved a major project upgrade, renovating the high school’s original DDC system with the expert help of their local Siemens Solution Partner.
Client Objective
The building’s original 12-year old HVAC system was barely functioning. Faulty and unpredictable, it not only created a less than desirable learning environment, but made troubleshooting of mechanical or controller problems very difficult—costing hundreds of thousands of dollars in wasted time and money over the years.
A Siemens Solution Partner with decades of experience in improving building performance was selected for the job. The project began in early July, with the need for completion by late August, before the return of the high school’s 286 students.
The Siemens Solution Partner proposed the open TALON with BACnet Building Automation System for the 60,000-sf facility, which contains 25 classrooms, a multipurpose room, media room, auditorium, and gymnasium. TALON with BACnet enables a smooth integration with other systems, creating more integration flexibility than other systems on the market.
The TALON system, created to improve every aspect of building automation, would provide the school with the best integration of today’s technology and keep it open for future technology and new products.
The Best Total Solution Approach
TALON seamlessly linked into the high school’s existing infrastructure, giving budget-conscious administrators an immediate appreciation for its cost effectiveness. Its integration power, open architecture, and BACnet software made the TALON system an investment that will continue to pay the school district back for years. Future system integration opportunities include HVAC, lighting, power, process, fire/life safety, and security/access control.
Since TALON makes the necessary connections between systems, it can link the entire district, managing buildings as a whole, not as disparate systems—all from a single workstation. The system can be monitored and controlled from any Web-enabled device, maximizing staff productivity and building performance and minimizing disruptions to events inside the facility.
Contact Info:
For more information, contact Phil Dlatt, 847-941-6033, phil.dlatt@siemens.com; www.usa.siemens.com/talon
Top Honors for High-Performing Control System
Following the completed work, Hudson High School now boasts a state-of-the-art, fully integrated building automation system that incorporates DDC for energy management, equipment monitoring, and control.
The improved control system at Hudson High School has successfully impacted the learning environment, the bottom line, and the buildings most important function: providing a comfortable learning environment for children and teachers.
Related Stories
| Apr 4, 2012
San Antonio animal hospital earns LEED Platinum certification
Middleman Construction Company builds the city?s first commercial building to earn certification.
| Apr 3, 2012
Product Solutions
Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.
| Apr 3, 2012
SSOE acquires MEP Firm CRS Engineering & Design Consultants
The acquisition will expand SSOE’s Southeastern U.S. presence, broaden CRS’s reach to international markets, and provide both firms’ clients access to enhanced services and resources.
| Apr 2, 2012
Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper
The operation of the elevator is scheduled to begin in 2014.
| Mar 30, 2012
18 handy tablet apps for AEC professionals
Check out these helpful apps for everyday design and construction tasks. Our favorite: MagicPlan, which uses GPS to help you measure and draw a floor plan of any room.
| Mar 29, 2012
Construction completed on Las Vegas’ newest performing arts center
The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.
| Mar 27, 2012
Skanska hires aviation construction expert Bob Postma
Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.
| Mar 21, 2012
10 common data center surprises
Technologies and best practices provide path for better preparation.
| Mar 20, 2012
New office designs at San Diego’s Sunroad Corporate Center
Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.