AECOM, an integrated global infrastructure firm, and Project Frog, an innovator in advanced component buildings, are forming a partnership to address the increasing need for data centers. The Rapid Deployment Team will construct modular buildings with the quality and flexibility of traditional construction methods.
Project Frog leverages the integration of components from off-site manufacturing that are designed for shipping and rapid on-site installation. The Converge data center kit results in an accelerated construction schedule which materially increases the speed to market of a revenue-producing data center anywhere in the world.
For more than 25 years, AECOM has planned, designed, and constructed data centers and mission critical facilities around the world. The company has a deep knowledge of the data center market and expertise in the turnkey provision of data center facilities. AECOM provides solutions that allow simplified installation processes that enable future expansion with cost, time, and maintenance benefits.
With customizable solutions for small (1 MW) to large data centers (50+ MW), the AECOM and Project Frog Rapid Deployment Team streamlines data center development. The solution allows for consistent and scalable roll out globally.
Related Stories
| Feb 14, 2013
Boxman Studios launches shipping container buildings division
Boxman Studios has launched a new division aimed at sustainable solutions for the Built Environment. The Boxman Studios Buildings Division will focus on the adaptive use of decommissioned shipping containers as architectural elements and even complete buildings.
| Dec 9, 2012
Greenzone pop quiz
Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.
| Dec 9, 2012
Modular classroom building makes the grade
SAGE modular classroom opens eyes, minds at Greenbuild 2012.
| Sep 28, 2012
Seattle is home to first LEED-certified modular radiation center
By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.
| Sep 19, 2012
Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth
By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 3, 2012
Best commercial modular buildings and marketing programs recognized
Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.